Gulf Oil and Gas accountACCOUNT

Oando Resumes Production From the Ebendo Field

Source: www.gulfoilandgas.com 12/27/2012, Location: Africa

Oando Energy Resources Inc, a company focused on oil exploration and production in Nigeria, announced an update regarding the damaged 10 inch Kwale-Akri oil delivery pipeline that is operated by Nigerian Agip Oil Company Limited (NAOC) and connects OER's Ebendo Field (OML 56) to the Brass export terminal (as previously disclosed on November 12, 2012).

The Kwale-Akri pipeline has been fully repaired and has commenced operations with reduced volumes being injected into the pipeline for testing, to ensure full integrity before full volume capacity is attained. Gross production from the Ebendo Field (OML 56) has recommenced at approximately 2,000 Barrels Per Day ("bbls/day"), (900 bbls/day net to OER) with a gradual ramp-up to full gross production of 4,000 bbls/day expected over the next several weeks, as full pipeline integrity is confirmed.

Prior to the Kwale-Akri pipeline shut-in, OER was producing approximately 4,600 bbls/day from its two producing assets, the Abo Field (OML 125) and the Ebendo Field. The Abo Field produces 3,225 bbls/day into a floating, production, storage and offloading unit and has not been affected by the pipeline disruptions. As stated above, The Ebendo Field is currently producing 900 bbls/day of production (net to OER), resulting in OER currently producing a cumulative total of 4,125 bbls/day. OER owns a 42.75% non-operating interest in the Ebendo Field (OML 56).

Production News in Nigeria >>

Iran >>  4/22/2019 - The Iranian Offshore Oil Company (IOOC) has increased oil production from Dorous offshore oilfield by launching Well D-6 in the field. ...
Russia >>  4/22/2019 - A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Sergey Levchenko, Governor of the Irkutsk Region, took plac...

Iran >>  4/20/2019 - The CEO of Petroleum Engineering and Development Company (PEDEC),Touraj Dehghani,said that a number of wells had been closed in flood- hit in the West...
Azerbaijan >>  4/16/2019 -  SOCAR commissioned its highest-capacity well drilled at Umid field; it will produce 900 million cubic meters of natural gas annually ...

Nigeria >>  4/15/2019 - MX Oil plc, an oil and gas investing company quoted on AIM, announces the following corporate update: ...
Iraq >>  4/14/2019 - Dana Gas PJSC (the "Company"), the Middle East's largest regional private sector natural gas company, announces that during Q1 2019, Pearl Petroleum C...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Transportation, 4X4 Trucks  Utility Systems  Water Supply Services  Welding Products/Services 


Nigeria Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |

Oil & Gas Projects in Nigeria >>

More News

Related Links

Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.