TransGlobe Announces Another Successful Development Well inYemen.

Source: www.gulfoilandgas.com 2/3/2006, Location: Middle East

TransGlobe Energy Corporation announced another successful development well on Block S-1 in Yemen (25.0% working interest). An Nagyah #19, which commenced drilling on January 9th, 2006, reached a total depth of 1,705 meters and was completed as a producing oil well after flowing at a stabilized rate of 3,226 barrels of light (43 degree API) oil per day and 1.6 million cubic feet of gas per day at a flowing pressure of 500 psi on a 48/64 inch choke.

The An Nagyah #19 well encountered the Lam A sandstone reservoir and was completed in a 266 meter horizontal section. The well is now being pipeline connected to the An Nagyah facilities.

The drilling rig is preparing to move to the next drilling location at An Nagyah #20. The An Nagyah #20 well is planned as an 850 meter horizontal well in the Lam A sandstone of the An Nagyah field, between vertical producers An Nagyah #5 and An Nagyah #7 in the western portion of the field.


Qatar >>  8/10/2022 - McDermott International has been awarded a Front-End Engineering Design (FEED) contract by QatarEnergy for the North Field South (NFS) Offshore Pipeli...
Qatar >>  7/20/2022 - Milaha, the industry-leading provider of maritime and logistics solutions in Qatar, has announced a significant five-years contract award with an opti...

Related Categories: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 

Related Articles: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.