Petrobras Begins Extended Well Test in the Campos Basin

Source: www.gulfoilandgas.com 6/28/2011, Location: South America

Petrobras have started producing oil in Aruana - an area located in the post-salt layer of the southern part of the Campos Basin - from well 1-RJS-661 in block C-M-401. The Cidade de Rio das Ostras FPSO (floating production, storage and offloading platform), in operation at the site, will produce up to 12,000 barrels of oil per day, limited to the capacity of the equipment used.

The test on well 1-RJS-661 is part of the Discovery Assessment Plan (DAP) approved by the ANP for developing the area. Exploratory block C-M-401 is located between the Pampo and Espadarte fields, and ocean depths range from 350 to 1500 meters. Formation tests carried out after well 1-RJS-661 was drilled, in March 2009, showed evidence of 27° API oil and recoverable volumes of around 280 million barrels of oil. .

The Aruana EWT is slated to last approximately six months. The information obtained in the process will assist in studies aimed at characterizing the reservoir rock, fluids, and the productive potential of the oil accumulations in the block.


United States >>  6/29/2022 - PDC Energy, Inc. announced that the Colorado Oil and Gas Conservation Commission (“COGCC”) approved the Company’s Broe Oil & Gas Development Plan (“OG...
Trinidad and Tobago >>  6/27/2022 - Onshore Trinidad's Ortoire block is where Touchstone Exploration Inc. ("Touchstone" ) (TXP) provides an update on operational progress. The Ortoire bl...

United Kingdom >>  6/23/2022 - Highlights:
• Anning and Somerville gas field development classified as Reserves following an independent Technical and Commercial Audit conducte...

Morocco >>  6/22/2022 - Chariot (CHAR), the Africa focused transitional energy company, announces its audited final results for the year ended 31 December 2021. ...

United Kingdom >>  6/21/2022 - Union Jack Oil, a conventional onshore hydrocarbon production, development, and exploration business based in the United Kingdom, has released details...
Canada >>  6/16/2022 - - 2022 guidance increased to an average production range of 31,500 to 32,500 boe/d based on expanded capital development program
- Second half 2...


Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.