OGX Concludes the Connection of FPSO OSX-1 to the Turret

Source: www.gulfoilandgas.com 1/13/2012, Location: South America

The connection of the FPSO OSX-1 to the turret was concluded on Thursday 12th. The turret interconnects the production unit to the OGX-26 well and to the anchoring system.


Australia >>  11/14/2024 - Woodside Energy has passed a major milestone for its operated Trion Development offshore Mexico with the start of steel fabrication for the semi-subm...
Suriname >>  11/14/2024 - Technip Energies in partnership with SBM Offshore, has been awarded a major(1) contract by TotalEnergies for the GranMorgu Floating Production, Stora...

Guyana >>  11/7/2024 - SBM Offshore and ExxonMobil Guyana Ltd, an affiliate of Exxon Mobil Corporation, have completed the transaction related to the purchase of FPSO Prospe...
United Kingdom >>  10/29/2024 - Serica Energy plc (AIM: SQZ) announces that production via the Triton FPSO has been interrupted owing to a problem with the single gas compressor in o...

Brazil >>  10/25/2024 - The Almirante Tamandare platform ship has arrived in Brazil. The unit will be installed in the Búzios Field, in the pre-salt layer of the Santos Basin...
Brazil >>  10/17/2024 - ABS has secured a contract to provide and test a digital twin solution for real-time condition monitoring for a Petrobras floating production, storage...

Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.