Senex Commenced Worrior Oil Field Development

Source: www.gulfoilandgas.com 6/24/2013, Location: Not categorized

Senex Energy Limited commenced development drilling at Worrior oil field over the weekend with the spudding of Worrior-8 in southern Cooper Basin permit PPL 207 (Senex 70% and operator, Cooper Energy 30%).

Ensign Rig 48 commenced drilling on Saturday 22 June and is drilling ahead to a total depth of 1,780 metres, targeting the Murta Formation, 236 metres south west of Worrior-1.

Worrior-8 is one of two wells that will be drilled at the oil field in the September quarter and the first well of a substantial oil drilling program that will be undertaken across Senex’s Cooper Basin permits into 2013/14.

The objectives of this well are to assess the productivity potential of the Murta formation, test for unswept oil in the Hutton sandstone and Birkhead formation, and test for gas in the Patchawarra formation. Senex plans to cut 36 metres of core from the Murta Formation which is productive in offset fields and has been proven to contain oil at Worrior but never produced. Drilling, coring and logging is expected to take approximately 18 days.




Russia >>  11/28/2024 - The Gazprom Management Committee approved the 2025–2029 Technology Program for the development of the remaining recoverable reserves of the Nadym-Pur-...
Spain >>  11/27/2024 - Prospex Energy plc (AIM:PXEN), the investment company focused on European gas and power projects, wishes to update shareholders on the schedule of the...

Azerbaijan >>  11/26/2024 - The President of the State Oil Company of the Republic of Azerbaijan (SOCAR), Rovshan Najaf, met with John Wallace, the Chairman and CEO of DeGolyer a...
Brazil >>  11/26/2024 - BRAVA ENERGIA (“BRAVA”) (B3: BRAV3) (“Company”) informs its investors and the market in general that the Company signed, in November, the main contrac...

Falkland Islands >>  11/25/2024 - Rockhopper Exploration plc (AIM: RKH), the oil and gas company with key interests in the North Falkland Basin ("NFB"), notes the recent update publish...
Oman >>  11/25/2024 - The Field Development Plan (“FDP”) for Block 56 has been approved by the Ministry of Energy and Minerals. With the approval of the FDP, Block 56 has b...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.