Gulf Oil and Gas accountACCOUNT

SOCAR Drilling Works for June 2013

Source: www.gulfoilandgas.com 7/5/2013, Location: Asia

SOCAR (excluding Joint Ventures and Operating Companies) conducted 12224 meters drilling works in June 2013.Of this amount, development drilling made up 11022 meters, 1202 - meters exploration drilling. In general in January-June 2013, SOCAR (excluding Joint Ventures and Operating Companies) carried out 83334 meters drilling works including 78098 meters development drilling and 5236 meters exploration drilling.

Drilling News in Azerbaijan >>

Australia >>  7/14/2020 - Highlights
West Erregulla
- AGIG selected to build, own and operate Phase 1 gas processing plant; FEED underway.
- Ensign 970 drilli...

Brazil >>  7/14/2020 - Petrobras informs that in early July, it completed, in half the time, the construction of the 7 GLF 49H ESS offshore well, in the Golfinho field, in t...

Norway >>  7/14/2020 - Equinor Energy AS, operator of production licence 089, has completed the drilling of wildcat well 34/7-E-4 AH just northwest of the Vigdis Vest field ...
Nigeria >>  7/13/2020 - LEKOIL, the oil and gas exploration and production company with a focus on Nigeria and West Africa, announces that the Otakikpo Joint Venture ("Otakik...

Norway >>  7/9/2020 - Petroleum Safety Authority has given Aker BP consent to use the Maersk Invincible mobile drilling facility for drilling of a pilot hole on the Hod fie...
Norway >>  7/9/2020 - Reference is made to the stock notices on 17 June and on 3 July. The licence has decided to drill a side-track well to further evaluate the size of th...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Azerbaijan Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.