Gulf Oil and Gas accountACCOUNT

Cue Energy Updates on Mahakam Hilir PSC

Source: www.gulfoilandgas.com 12/20/2013, Location: Asia

Cue Energy Resources Ltd (Cue) advises that the Naga Utara-2 ST well is at a depth of 5,520 ft MDKB (1,676m). Since the last report, a window has been milled in the 9?” casing and the well has been successfully sidetracked around the obstruction left in the original hole. The well is currently drilling ahead in 8½” hole towards a revised total depth of 6,818 ft MDKB (2,078m).

The well site is located in the onshore portion of the Kutei Basin on the island of Kalimantan (Borneo), approximately 10 km NE of the town of Samarinda (map attached).

Naga Utara-2 is operated by SPC Mahakam Hilir Pte Ltd, a subsidiary of Singapore Petroleum Company Ltd. The well is the third to be drilled by the Mahakam Hilir Joint Venture and will appraise the gas shows seen in Miocene-age sandstones at Naga Utara-1 which were not fully evaluated in the previous well due to mechanical problems. The well will then be deepened to evaluate additional reservoir objectives. The well is being drilled from the same pad as Naga Utara-1 to a target location approximately 475m north of the earlier well.

Cue will provide progress reports during the drilling of Naga Utara-2; the next progress report will be issued on 3 January 2014.

Participating interests in the Mahakam Hilir PSC are as follows:
Cue Mahakam Hilir Pty Ltd 40%
SPC Mahakam Hilir Pte Ltd 60% (Operator)

Drilling & Well Services >>

Drilling & Well Services News in Indonesia >>

China >>  2/14/2019 - Fluor Corporation (FLR) was awarded the engineering, procurement and construction management contract for Valvoline’s new blending and packaging facil...
Russia >>  2/14/2019 - Alexey Miller, Chairman of the Gazprom Management Committee, and Yan Novikov, Chairman of the Management Board, Director General of the Almaz-Antey Co...

Russia >>  2/1/2019 - PAO NOVATEK (“NOVATEK” and/or the “Company”) announced that Arctic LNG 2 (the “Project”) and Siemens signed a contract on compressor equipment for thr...
Azerbaijan >>  1/28/2019 - Representatives of SOCAR headed by the President Rovnag Abdullayev held a meeting in Baku with a delegation from Kazakhstan, led by Alik Aydarbayev, C...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Indonesia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |

Oil & Gas Projects in Indonesia >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.