Gulf Oil and Gas accountACCOUNT

AWE Limited Provides Pateke-4H Drilling Update

Source: www.gulfoilandgas.com 3/18/2014, Location: Not categorized

AWE Limited reports that as at 06:00 hours, the Pateke-4H development well was preparing to sidetrack a short section of lower wellbore. The mechanical drill string difficulties experienced in the original hole were unable to be fully resolved and the lower part of the hole has been abandoned. It is now proposed to sidetrack with a 12 ¼ inch drilling assembly from a measured depth of 3,375m, drill into the F10 reservoir at a horizontal angle of approximately 90 degrees, and then set the 9 5/8 inch casing at approximately 4,110m as planned. The well will then be drilled horizontally through the F10 reservoir to a total measured depth of 5,361m.

The Kapuni F10 sandstone objective has already been intersected on prognosis with oil shows and real time logging measurements indicating the likely presence of an oil bearing reservoir, which is very encouraging. However, the commercial significance of the oil shows will not be clear until the horizontal drilling has been completed.

The Pateke-4H development well is in PMP 38158 and AWE is the Operator. Located in the offshore Taranaki Basin, New Zealand, PMP 38158 contains the Tui, Amokura and Pateke fields and has been producing since 2007.

Pateke-4H is targeting a mapped northern extension of the currently producing Pateke field. The well is being drilled in water depth of approximately 124m with a planned total measured depth of 5,361m, including a 1,272m horizontal section. If successful, the well will be completed for subsequent tie-back to the Tui FPSO (“Umuroa”) for production in 2015.

The Joint Venture partners in PMP 38158 are:

AWE Limited (via subsidiaries) (Operator) 57.5%
New Zealand Oil & Gas (via subsidiaries) 27.5%
Pan Pacific Petroleum (via subsidiaries) 15.0%

Drilling News in New Zealand >>

Norway >>  4/6/2020 - Aker BP, operator of production licence 1008, has concluded the drilling of wildcat well 6506/5-1 S. The well was drilled about 50 kilometers southwes...
United Kingdom >>  4/6/2020 - The government admits it acted unlawfully in granting BP’s permit to drill for new oil in the North Sea, a Greenpeace legal challenge reveals, after o...

Iran >>  4/4/2020 - The drilling and completion of six oil wells was completed from April 1st to April 15th by using the rigs of the National Iranian Drilling Company in ...
Egypt >>  4/2/2020 - TransGlobe Energy Corporation (TGA) (“TransGlobe”) announces a Q1 financial, operations and corporate update. All dollar values are expressed in US do...

Brazil >>  3/30/2020 - Petro-Victory Energy Corp. is pleased to provide the market with a drilling and operational update across the Company’s portfolio of assets in Brazil....
Australia >>  3/26/2020 - Falcon Oil & Gas has provided an operational update on the Beetaloo project in the Northern Territory, Australia in light of COVID-19. Following the s...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


New Zealand Oil & Gas 1 >>  2 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.