Hardman Resources Limited announced Since the last report on 5th September, the ‘Atwood Hunter’ has drilled the Flamant-1 exploration well to a depth of 2,035 meters where the 13 3/8” casing has been run and cemented. As of midnight on the 11th September, preparations were underway to drill ahead in the 12 ¼” hole to the planned total depth of3,370 meters.
Flamant-1 targets Cretaceous Carbonates and is located in 1,414m of water, approximately 210km from the shore and 195 km North-West from Pelican-1, a Cretaceous gas discovery drilled in Block 7.