Cue Energy Spuds Whio-1 Exploration Well

Source: www.gulfoilandgas.com 7/24/2014, Location: Not categorized

Cue Energy Resources Ltd has been advised by OMV New Zealand Ltd, the Operator of permit PEP 51313, that the Whio-1 exploration well spud at 21:45 hours (local time) on 23rd July (map attached). The rig came on contract on 19th July and was towed 40 km from the previous location arriving at the Whio location on 20th July.

Whio-1 is being drilled from the semi-submersible drilling rig ‘Kan Tan IV’ at a surface location 110 km south-west of New Plymouth, Taranaki, New Zealand and 4.5 km south-east of the Maari well-head platform. The well has a planned total depth of 2,879m MDRT (2,754m TVDRT) and the well path will be deviated northwards from the surface location to avoid possible shallow drilling hazards above the subsurface targets.

The primary reservoir objectives at Whio are the M2A Sandstone and Mangahewa Formation which are oil bearing in the Maari Field. Secondary reservoir objectives are the Moki, Kaimiro and Farewell formations. Cue’s assessment of Whio indicates mean unrisked prospective resources of 18 million barrels of oil (100% basis). The close proximity of Whio to existing production infrastructure at the Maari Field provides potential opportunities for early development of any discovered petroleum. A successful well at Whio will open additional exploration potential along the Tasman Ridge to the south of Maari, including the Matariki prospect.

Cue will be free-carried by OMV in the drilling and completion of Whio-1 under the terms of a farm-out agreement signed in December 2012.


Germany >>  8/18/2022 - Neptune Energy announced drilling has begun on a new production well at its operated Romerberg oil field in the Rhine Valley, south-western Germany....
Norway >>  8/15/2022 - The Norwegian Petroleum Directorate (NPD) has granted PGNiG Norway Upstream AS drilling permit for well 6608/1-1 S, cf. Section 13 of the Resource Man...

Norway >>  8/12/2022 - Aker BP ASA, operator of production licence 941, has concluded the drilling of wildcat well 6507/3-15.

The well was drilled about 14 km nor...

Australia >>  8/9/2022 - Central Petroleum Limited (“Central”) advises that as at 0600 hrs ACST on 8 August 2022, the Palm Valley 12 (PV12) well in OL3, Southwest of Alice Spr...

Norway >>  8/9/2022 - The Petroleum Safety Authority Norway has given Equinor consent for exploration drilling in block 6507/8 in the Norwegian Sea.

Operator: E...

Guyana >>  8/5/2022 - The drilling of the Beebei-Potaro exploratory well, located in the Kanuku licence, off the coast of Guyana, has been finished, according to Tullow Oil...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.