Tower Resources Provides Badada-1 Well Drilling Update

Source: www.gulfoilandgas.com 2/18/2015, Location: Africa

Tower Resources plc (Tower), the AIM-listed Africa-focussed oil and gas exploration company, provides an update on drilling operations for the Badada-1 well, Block-2B, onshore Kenya.

Tower has received formal notification from Lion Petroleum Inc. (Lion), the wholly-owned Kenya-based subsidiary of Taipan Resources Inc. (Taipan), and Operator of Block-2B (Tower 15%, Premier Oil 55% and Taipan 30% working interests) regarding the status of the Badada-1 well as at 24:00 GMT on 17 February 2015.

The Badada-1 well was spud at 14:00 GMT on 7 January 2015 and has been drilled to a total depth of 3,372 metres MDBRT (Measured Depth Below the Rotary Table) intersecting the Neogene sequence. Preparations are underway for the logging of the 12¼-inch hole section from the 13 3/8-inch casing point, located at 1,644 metres MDBRT, to a drilled depth of 3,500 metres MDBRT and is expected to be completed in the next few days. The well is planned to be drilled to a total depth of between 3,000 and 4,000 metres in order to test Tertiary age primary targets.

It is the Company’s intention to provide operational updates when Badada-1 has progressed further. A comprehensive update will also be provided once operations on the Badada-1 well have been fully completed and analysed.

For more information about related Opportunities and Key Players visit East Africa Projects


Norway >>  3/24/2023 - Equinor Energy AS, operator of production licence 554, has concluded the drilling of wildcat well 34/6-6 S. The well was drilled about 10 kilometres n...
Colombia >>  3/22/2023 - Arrow Exploration Corp. (AIM: AXL; TSXV: AXL) ("Arrow" or the "Company") is pleased to provide an update on the drilling activity at Rio Cravo Este ("...

Nigeria >>  3/21/2023 - Dolphin Drilling AS announces that the Blackford Dolphin has commenced its 12-month drilling contract with General Hydrocarbons Limited (GHL) in Niger...
Australia >>  3/20/2023 - - Drilling of the Canyon-2 well with SLB Land Rig 185 has successfully commenced
- Canyon-2 will be drilled to a depth of approx. 3600 metres a...


Mexico >>  3/17/2023 - The enclosed announcement has been reported by Eni regarding the Yatzil exploration prospect in Block 7, located in the mid-deep water of the Cuenca S...
Turkey >>  3/17/2023 - WELL: West Akcakoca-1
Days since move: 29
Progress: 115 metres
Measured Depth: 3839 metres

Week Summary:
Drill 8 ½” ...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.