VAALCO Spuds its First Well on Block 5 Offshore Angola

Source: www.gulfoilandgas.com 3/4/2015, Location: Africa

VAALCO Energy, Inc. announced that on March 2, 2015, the Company spudded the post-salt Kindele-1 well, its first exploration well on Block 5 offshore Angola. As previously announced, VAALCO contracted the Transocean "Celtic Sea" semi-submersible rig to drill the Kindele-1 well to a planned total depth of 2,250 meters in a water depth of approximately 100 meters.

Steve Guidry, Chairman and CEO, commented, "We are very pleased to announce this major step forward for our operations offshore Angola. After nearly nine years of continued commitment to our Block 5 license, we are embarking on an important phase in our efforts to explore for hydrocarbons from a second West African country. We continue to believe that Block 5 is within an area with potential in both post- and pre-salt formations including the syn-rift and sag play."

As previously announced in October 2014, VAALCO, together with its working interest partner, Sonangol P&P, entered into the Subsequent Exploration Phase (SEP) on Block 5. Under the SEP, VAALCO and Sonangol P&P have committed to drill a total of four exploration wells during the exploration extension period, which expires in November 2017. The four-well obligation includes the original two-well commitment under the primary exploration period that carries over to the SEP period.

The Kindele-1 well will test a fault block adjacent to the Mubafo discovery which tested oil from the Mucanzo sand section within the Pinda group formations. The Kindele-1 will be drilled to a depth of 1,800 meters to evaluate the Mucanzo sand section. The well will then be deepened to the salt to an estimated depth of 2,250 meters for geologic and geophysical correlation. The well is expected to take approximately six weeks to drill to total depth.

Additionally, the Company is nearing finalization of the seismic processing in the outboard portion of Block 5. The seismic processing is being performed to image pre-salt structures as potential targets for future exploration wells on Block 5.

For more information about related Opportunities and Key Players visit West Africa Projects


Norway >>  1/14/2025 - Aker BP and its partner Concedo drilled the dry well 24/12-8 S near the Bøyla field in the North Sea.

This well, "Rumpetroll South", is a f...

United States >>  1/14/2025 - Kolibri Global Energy Inc. (the “Company” or “Kolibri”) (TSX: KEI, NASDAQ: KGEI) is providing 2025 guidance for its Tishomingo field in Oklahoma.
<...


Norway >>  1/10/2025 - The Norwegian Ocean Industry Authority (Havtil) has conducted an audit of the follow-up by Noble Drilling Norway (Noble) of the alarm management syste...
United States >>  1/9/2025 - Zephyr Energy plc, the Rocky Mountain oil and gas company focused on responsible resource development and carbon-neutral operations, is pleased to con...

Norway >>  1/8/2025 - The Norwegian Offshore Directorate has granted DNO Norge a drilling permit for well 35/10-15 S in production licence PL 1182 S.

Geographica...

Norway >>  1/8/2025 - The Norwegian Offshore Directorate has granted Aker BP a drilling permit for well 6507/2-8 in production licence PL 942.

Geographical coord...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.