Gulf Oil and Gas accountACCOUNT

Schlumberger Introduces Coiled Tubing Real-Time Multiset Inflatable Packer

Source: www.gulfoilandgas.com 3/26/2015, Location: North America

Schlumberger announced the release of the ACTive Straddle coiled tubing real-time multiset inflatable packer. The packer provides all functions needed to isolate and treat multiple zones on a single run without coming out of the well, which reduces intervention time and optimizes production.

“Conventional stimulation treatments of multizone reservoirs lack efficiency when targeted coverage is required, leading to lower production recovery,” said Sameh Hanna, president, Well Intervention, Schlumberger. “With the ACTive Straddle inflatable packer, customers now have a robust multiset system that provides precise fluid placement, proper depth control, and ensures packer integrity during treatment using real-time measurements—all in a single intervention.”

The inflatable packer is conveyed with coiled tubing (CT) into vertical, deviated or horizontal wellbores, eliminating expensive mobilizations and potential completion removals by enabling multiple treatments in a single intervention. The CT fiber-optic real-time telemetry provides downhole measurements to optimize fluid placement, ensure accurate depth control, monitor packer pressure during setting and unsetting, and enable precise flow control and setting tool manipulations.

During field testing, more than 147 inflation and deflation multisetting procedures were performed. The ACTive Straddle inflatable packer was also field tested in more than six interventions in challenging onshore and offshore intervention conditions, including the Middle East and the North Sea.

In the Middle East, a customer needed to identify and remediate multiple plugged inflow control devices (ICDs) in two wells. Using distributed temperature sensing analysis to discover problematic ICDs, a single ACTive Straddle inflatable packer run was performed to restore flow. In one well, production increased by 150% from 480 bbl/d to 1,200 bbl/d. Production from the second well increased 171%—from 2,100 bbl/d to 5,700 bb/d, saving more than a week of intervention time compared with conventional intervention treatments.

Coiled Tubing >>

Coiled Tubing News in United States >>

United States >>  9/16/2019 - Baker Hughes, a GE company (BHGE) announced the closing of a secondary offering (the offering) of 132.25 million shares of BHGE Class A common stock, ...
United States >>  9/6/2019 - SBM Offshore and ExxonMobil signed a Long-Term Agreement covering potential future FPSO orders. This agreement is non-exclusive and establishes the ge...

United States >>  9/5/2019 - TGS has purchased all the outstanding shares and completed the acquisition of Lasser, Inc., a Fort Worth-based company which provides historical and m...
United States >>  8/27/2019 - Halliburton Company (HAL) released ten new DecisionSpace® 365 E&P cloud-native applications that leverage advances in digital technology to help opera...

Related Categories: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Articles: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Lubricating Equipment 


United States Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.