Gulf Oil and Gas accountACCOUNT

Candax Commences Drilling at El Bibane

Source: www.gulfoilandgas.com 7/31/2007, Location: Africa

Candax Energy has commenced drilling of the first well in the three-well development program on the El Bibane oil and gas field, offshore Tunisia. The EBB-4 is being drilled using the West Titania jack-up rig. First oil and gas production from EBB-4 is expected by the first week of October 2007. Upon completion of EBB-4, the West Titania rig will move to the second well location, EBB-3RE2, to re-complete the existing well by drilling a new, horizontal production well in the oil column. It is anticipated that the completion of EBB-3RE2 should take approximately 30 days, when the rig will be moved to the final location, EBB-5, which will be used as a gas re-injection well. First gas injection is likely to commence early in December.

Offshore Drilling News in Tunisia >>

Egypt >>  7/1/2020 - Eni (as the Operator of the Block), BP and Total (as Contractor members) have successfully drilled the first exploration well in the North El Hammad l...
Egypt >>  6/24/2020 - Bilfinger Tebodin Middle East in Egypt has signed an Engineering Master Service Agreement with PETROJET with it's main office located in Cairo and 15 ...

Egypt >>  6/18/2020 - Cheiron announces that the GNN-4 well, which was drilled to appraise the recent GNN oil discovery, has been completed and successfully tested at initi...
Egypt >>  6/15/2020 - - Committed and planned energy investments in APICORP’s 2020-24 investment outlook amount to USD792bn, a USD173mn drop compared to USD965bn in 2019-20...

Algeria >>  6/9/2020 - The Bir Sebaa Group, made up of SONATRACH and its two partners PTTEP and PVEP, on the one hand, and the Italian company specialized in Engineering May...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 |

Oil & Gas Projects in Tunisia >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.