Gulf Oil and Gas accountACCOUNT

Drilling Activities at Zohr Field to Re-Start in January

Source: www.gulfoilandgas.com 11/26/2015, Location: Africa

The President of the Republic of Egypt, Abdel Fattah el-Sisi, met in Cairo Eniís Chief Executive Officer, Claudio Descalzi.

During the meeting, which follows the recent ones of August and October, Eniís CEO could make with President el-Sisi an assessment on the work in-progress of the plan for the development of the Zohr field, where drilling activities will restart in January 2016, as well as the timing and costs associated.

The meeting was an opportunity to review all Eniís assets in Egypt with the aim of maximizing the production in the country, with a particular focus on the Nooros discovery, which, with the production start of the second well, will reach a potential of 5MMsmc/d.

Furthermore, they discussed the prospects that could result from the establishment of a gas hub in the Eastern Mediterranean Sea, which would allow to share Egyptian transport infrastructures and exports with the nearby discoveries in the area, as those of Cyprus and Israel.

For more information about related Opportunities and Key Players visit Egypt Oil and Gas Projects

Drilling News in Egypt >>

Norway >>  12/10/2018 - The Norwegian Petroleum Directorate has granted Equinor a drilling permit for well 36/1-3 in production license PL 885. Well 36/1-3 will be drilled fr...
Argentina >>  12/7/2018 - President Energy, the upstream oil and gas company with a diverse portfolio of production and exploration assets focused primarily in Argentina, has p...

Morocco >>  12/7/2018 - Sound Energy, the Moroccan focused upstream gas company, has confirmed that the drilling at TE-10, the second well of a planned three exploration well...
Thailand >>  12/7/2018 - Ophir has provided an update on recent drilling activity in Indonesia and Thailand: Paus Biru Gas Discovery, Sampang PSC, Indonesia ...

Norway >>  12/5/2018 - The Norwegian Petroleum Directorate has granted Equinor Energy AS a drilling permit for well 35/11-22 S, cf. Section 15 of the Resource Management Reg...
Australia >>  12/4/2018 - JV partner Carnarvon Petroleum has advised that the contract for the Noble Tom Prosser jack-up drilling rig has been secured. The shallow water depths...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Egypt Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |

Oil & Gas Projects in Egypt >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.