UKOG Receives Final Flow Test Consent for Horse Hill-1 Discovery

Source: www.gulfoilandgas.com 1/4/2016, Location: Europe

UK Oil & Gas Investments PLC ( UKOG) has been notified by Horse Hill Developments Limited (HHDL) that the Oil and Gas Authority (OGA) has granted consent for an extended flow test over three separate zones in the Horse Hill-1 (HH-1) oil discovery well. All necessary permissions to test the well are now in place.

The HH-1 discovery well, drilled at the end of 2014, is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport, in which UKOG owns a 20.163% interest.

Stephen Sanderson, UKOG’s Executive Chairman commented:

“The extended test will provide the Company with a very definitive start to the New Year. We look forward to safe and successful operations.”

UKOG's interest in Horse Hill

The HH-1 well is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. UKOG owns a 30% direct interest in HHDL and a 1.02% interest in HHDL via its 6% interest in Angus Energy Limited. HHDL is a special purpose company that owns a 65% participating interest and operatorship of Licence PEDL137 and the adjacent Licence PEDL246 in the UK Weald Basin.


Egypt >>  8/4/2022 - An update on the drilling of the Al Jahraa-14 development well (AJ-14) in the Abu Sennan licence, onshore Egypt, is being released by United Oil & Gas...
Nigeria >>  7/29/2022 - San Leon, the independent oil and gas production, development and exploration company focused on Nigeria, notes the announcement made by Decklar Resou...

Ivory Coast (Cote D'Ivoire) >>  7/28/2022 - Eni has successfully drilled the Baleine East 1X well, the first exploration well in block CI-802 and second discovery on the Baleine structure, offsh...
Algeria >>  7/25/2022 - Eni and SONATRACH announce a further discovery in Sif Fatima II concession, located in the Berkine North Basin in the Algerian desert. The Rhourde Oul...

Australia >>  7/20/2022 - • Strong performance observed from the W6 Cadda gas discovery which flowed at a maximum recorded rate of 35 mmscfd.
• Comingled testing of the Ca...

Cuba >>  7/18/2022 - Highlights
- Logging operations completed and 11-3/4” casing run to 1243 metres
- Drilled ahead to 1698 metres at which point the drill st...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.