DNO announces the results from well Nuzooh # 1 in Block 32, Yemen

Source: www.gulfoilandgas.com 10/31/2007, Location: Middle East

The Nuzooh #1 exploration well commenced drilling in the July and was drilled to a total depth of 3,704 meters and subsequently plugged and abandoned after encountering minor oil shows. The well was drilled south and west of the main Tasour field targeting prospects in the Qishn, Madbi/Naifa and Basement.

The drilling rig will now be moved to Block 44 for drilling of one exploration well. The rig is thereafter scheduled to drill an exploration well at Berhout #1 in Block 32, followed by a development well at Godah #8. The Berhout #1 well is expected to finish drilling in December or early January 2008. The Berhout #1 well is targeting a large Qishn structure defined on 3-D seismic and is located approximately 17 kilometers east northeast of the Godah field.


Australia >>  7/5/2022 - The Palm Valley 12 (PV12) well in OL3, southwest of Alice Springs in the Northern Territory, was at a depth of 2,335m in the P4 unit of the Pacoota Fo...
Brazil >>  7/5/2022 - A 540-day drilling contract with a start date of 2023 has been given to Valaris, represented by Ensco UK Drilling Limited and Ensco do Brasil Petróleo...

Canada >>  7/5/2022 - The Mobile Offshore Drilling Unit (MODU) Stena ICEMAX has a new contract with BP Canada Energy Group ULC, which Stena Drilling is happy to announce....
Indonesia >>  7/5/2022 - The second of the company's two back-to-back producing wells is where drilling activities have started, according to Indonesia Energy Corporation Limi...

Norway >>  7/4/2022 - The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy Norge AS drilling permit for well 35/6-3 S, cf. Section 13 of the Resource Manage...
Norway >>  7/4/2022 - The Norwegian Petroleum Directorate (NPD) has granted OMV (Norge) AS drilling permit for well 30/5-4 S, cf. Section 13 of the Resource Management Regu...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.