Drilling Works for December 2015
Source: www.gulfoilandgas.com 1/6/2016, Location: Asia
SOCAR (excluding Joint Ventures and Operating Companies) conducted 6686 metres of drilling works in December 2015. The development drilling made up the whole amount of the drilling works. In general, during January-December 2015, SOCAR (excluding Joint Ventures and Operating Companies) carried out 104411 metres drilling works including 103411 metres development drilling and 1000 meters exploration drilling.