Gulf Oil and Gas accountACCOUNT

Two Major Contracts Awarded for TAP Project

Source: www.gulfoilandgas.com 4/14/2016, Location: Asia

Trans Adriatic Pipeline AG (TAP) has awarded a contract to Salzgitter Mannesmann International GmbH for the supply of approximately 110km 36-inch offshore line pipes to be used in the 105 km section of the project across the Adriatic Sea, between the coastlines of Albania and southern Italy. In addition to Submerged Arc Welding Longitudinal (SAWL) line pipes, the contract also includes the supply of buckle arrestors, coating and anodes for the projectís offshore section.

This contract award makes up more than 71,000 tonnes of offshore line pipe.Trans Adriatic Pipeline AG.



Oil and Gas Pipeline >>

Oil and Gas Pipeline News in Azerbaijan >>

Related Categories: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Articles: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 


Azerbaijan Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.