Gulf Oil and Gas accountACCOUNT

30% Rise in North Azadegan Oil Deposits

Source: www.gulfoilandgas.com 5/1/2016, Location: Asia

Engineering studies over North Azadegan oilfield indicate that the field holds 30% more crude oil in its despite than was previously estimated in the field’s 2008 master development plan (MDP).

Mohammad Reza Asadi, director of engineering at Petroleum Engineering and Development Company (PEDEC), told Shana that finalization of the field’s MDP is one of the company’s agendas for development of the field.

Based on the master plan, North Azadegan field will be developed in 2 major phases, he said.

Asadi said the latest estimates show that the field holds 30% more crude oil than it was previously presumed in the MDP that was developed in 2008.

Drilling operations over 100 wells have started nearly a year ago and 60 of the wells are finalized with some being productive.

The field was first decided to be developed by a Chinese developer, CNPCI, but Iran expelled the contractor from North Azadegan for its failure to respect its obligations.

Production News in Iran >>

Australia >>  1/22/2019 - Santos has announced first oil from the Van Gogh infill project, marking the successful completion of the two-well program that will increase producti...
Norway >>  1/22/2019 - Preliminary production figures for December 2018 show an average daily production of 1,849,000 barrels of oil, NGL and condensate, which is a decrease...

Australia >>  1/21/2019 - Cooper Basin focused oil & gas company, Real Energy, has provided an update on the Tamarama-2 well which is located on the Company’s ATP927 permit in ...
Australia >>  1/21/2019 - Whitebark Energy (WBE) stands to increase its oil production by more than 200%, after flow testing of the Wizard Lake Rex horizontal oil well recorde...

Azerbaijan >>  1/16/2019 - • Production at the SOCAR’s carbamide plant will eliminate the need for imports of nitrogen fertilizers, thereby reducing the country’s expenditures i...
China >>  1/16/2019 - CNOOC Limited announced that Huizhou 32-5 oilfield comprehensive adjustment/Huizhou 33-1 oilfield joint development project has commenced production. ...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Transportation, 4X4 Trucks  Utility Systems  Water Supply Services  Welding Products/Services 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 |

Oil & Gas Projects in Iran >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.