Gulf Oil and Gas accountACCOUNT

Matra Petroleum Provides Operations update in Russia

Source: www.gulfoilandgas.com 12/17/2007, Location: Asia

Matra Petroleum provided an update on its operations in Russia on the Arkhangelovskoe License in Orenburg. The Arkhangelovskoe -12 discovery well has now been completed for oil production and the drilling rig is being moved off the location. At the same time a temporary production system is being installed at the well-site together with oil storage facilities to enable the well to produce and the resulting production to be trucked to the nearby rail terminal and sold. For operational and safety reasons the well may only be perforated and produced once the rig has been moved off location and the temporary production equipment installation completed. Initial priorities for the well will be to fully test the producing interval and to obtain additional pressure and production data before considering how best to optimise well production with appropriate wellbore treatments and pump installation.

Arkhangelovskoe – 11 exploration well: The drilling rig (from Orenburg Drilling Company) is moving to the next exploration well location Arkhangelovskoe-11 to test the undrilled Laptevskaya structure. The well which will take up to 120days to drill evaluate and is targeting 5 horizons in the Carbonferous and Devonian below 3100m. The well is expected to spud in about 12 days time.

Drilling News in Russia >>

Indonesia >>  11/13/2019 - Coro Energy has provided an operational update in relation to the drilling campaign in the Duyung Production Sharing Contract ('PSC') in the West Natu...
Norway >>  11/11/2019 - Norway's Petroleum Safety Authority has given Wintershall Dea consent for the exploration drilling of two wells in the Norwegian Sea. The wells 6604/5...

Australia >>  11/6/2019 - Cooper Energy (COE) announces a 10 well appraisal program by the PEL 92 joint venture commenced with the spudding of Callawonga-22 at 18:30 hours 5 No...
Egypt >>  11/5/2019 - The exploration wells, Baltim Southwest-1 and Baltim Southwest-2, in the Nile Delta region have been placed on production with a rate of around 190 mi...

Indonesia >>  11/5/2019 - Andalas Energy and Power has announced an operations update on the Betun Selo KSO, in which it has a production interest further to the agreement anno...
Brazil >>  11/4/2019 - Seadrill Limited (“Seadrill”) has secured a two year contract with Petroleo Brasileiro S.A. (“Petrobras”) for the West Tellus in Brazil. Total contra...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 |

More News

Related Links

AZ BD BN CN GE HK ID IN IR JP KH KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas
Copyright © 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.