Gulf Oil and Gas accountACCOUNT

Eni Granted Drilling Permit for Well 7222/1-1 in PL 226

Source: www.gulfoilandgas.com 6/13/2016, Location: Europe

The Norwegian Petroleum Directorate has granted Eni Norge AS a drilling permit for well 7222/1-1, cf. Section 8 of the Resource Management Regulations. Well 7222/1-1 will be drilled from the Scarabeo 8 drilling facility in position 7256' 45.94 north and 2219' 26.18 east in production licence 226.

The drilling programme for well 7222/1-1 relates to the drilling of a wildcat well in production licence 226. Eni Norge AS is the operator with an ownership interest of 60 per cent. The other licensees are DEA Norge AS with 20 per cent and Edison Norge AS with 20 per cent. The area in this licence consists of part of block 7220/1. The well will be drilled about 250 km north of Hammerfest.

Production licence 226 was awarded on 30 May 1997 in the Barents Sea project. This is the first well to be drilled within the licence area.

The permit is contingent on the operator securing all other permits and consents required by other authorities before the drilling activity commences.

Drilling News in Norway >>

Norway >>  8/3/2020 - The Norwegian Petroleum Directorate has granted ConocoPhillips Skandinavia AS a drilling permit for well 6507/4-1, cf. Section 15 of the Resource Mana...
Norway >>  7/31/2020 - Equinor Energy AS, operator of production licence 532, has concluded the drilling of wildcat well 7219/9-3. ...

Israel >>  7/30/2020 - Zion Oil & Gas, Inc. (ZN) announces formal approval from the Israel Ministry of Energy of its drilling plan for its next well in Israel. ...
Norway >>  7/30/2020 - Norway's Petroleum Safety Authority has given Equinor consent to use the Maersk Intrepid mobile drilling facility for production drilling, completion ...

Norway >>  7/29/2020 - The Norwegian Petroleum Directorate has granted Equinor a drilling permit for wildcat well 6407/1-8 S & A in production licence PL 263 D.

W...

Australia >>  7/28/2020 - HIGHLIGHTS
West Erregulla Field
Independent certification by RISC Advisory, based on a single well (WE-2), confirms West Erregulla 2C C...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Norway Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 |

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.