NISOC to Launch Several Gas Collection Projects

Source: www.gulfoilandgas.com 6/21/2016, Location: Asia

According to NISOC Production Manager, company’s gas collection projects have made 80% progress up to this time.

“Ghgalenar and Labsefid are two major gas collections & Injection projects which will come online this year,” said Abdolreza Dabir.

Saying that gas collection & Injection are from most complex industrial plans, he noted all infrastructures have been made in NISOC for promoting these industrial plans.

Now that economic sanctions have removed, the conditions are now ready for us to accelerate accomplishing industrial projects within south oil-rich operational areas.


Related Categories: Agents, Anti-foaming  Aromatic Solvents  Butene  Cleaning  Corrosion Inhibiting  Crude Oil  Diesel Fuel  Ethylene  Fluids Drilling, Completion, Workover & Stimulation  Fluids/Chemicals  Fracturing Sand  Fuel oil  Gasoline (Lead free)  General  Grout  Jet fuel  Kerosene. Domestic use  Lubricants, Oils & Greases  Nitrogen  Oil Treating & Refining  Polyethylene  Polyvinyl chloride  Propane  Sand, Sandblast  Summer Diesel  Surfactants 

Related Articles: Agents, Anti-foaming  Aromatic Solvents  Butene  Cleaning  Corrosion Inhibiting  Crude Oil  Diesel Fuel  Ethylene  Fluids Drilling, Completion, Workover & Stimulation  Fluids/Chemicals  Fracturing Sand  Fuel oil  Gasoline (Lead free)  General  Jet fuel  Kerosene. Domestic use  Lubricants, Oils & Greases  Nitrogen  Oil Treating & Refining  Polyethylene  Polyvinyl chloride  Propane  Sand, Sandblast  Surfactants 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.