Jura Announces Khanpur 2 Well Drilled Successfully

Source: www.gulfoilandgas.com 1/16/2008, Location: Asia

Jura Energy announced the successful drilling of the Khanpur 2 well in the Block 22 Gas Field which is located in the Central Gas Basin, Pakistan. The well was drilled to a total depth of 1,159 meters to the Sui Main Limestone reservoir on time and within budget. The well was tested at rates up to 6.71 MMcf/d; the maximum flow rate of the well is expected to be constrained by the installed 2-7/8” tubing string. The Khanpur 2 well will be tied-in to the Block 22 processing facilities after interconnecting pipeline has been laid, which is expected to occur in approximately three weeks time.

The rig will be moved to the Sadiq 2 well site following completion of an access road. Sadiq 2 is located approximately 12 kilometers from Khanpur 2 within Block 22 and is expected to spud towards the end of February. Sadiq 2 will be the third well drilled within Block 22 since September of 2007, and follows the successful drilling and completion of Hasan 3 in October 2007 and Khanpur 2 as described above. Following completion of the Sadiq 2 well, it is expected that the rig will be moved to the Hamza appraisal area for further drilling.

The Hasan 3 well, which was completed in October 2007, has been tied-in to the Block 22 processing facilities. The operator is currently producing the well at approximately 2 MMcf/d and will increase the production rate gradually over the next few weeks.

Jura holds a 10.5% participating interest in Block 22.


Germany >>  6/30/2022 - Drilling has started at Neptune Energy's operated Adorf Z17 gas appraisal well in the Georgsdorf municipality in northwest Germany, the company said. ...
Namibia >>  6/28/2022 - Reconnaissance Energy Africa Ltd. (“ReconAfrica”) and its joint venture partner NAMCOR (the state oil company of Namibia) are pleased to announce spud...

Norway >>  6/28/2022 - The Norwegian Petroleum Directorate (NPD) has granted ConocoPhillips Skandinavia a drilling permit for well 25/7-10 in production licence PL782 S.
...

Australia >>  6/27/2022 - On behalf of the EP469 JV, Strike Energy Limited (Strike - STX) offers an update on the appraisal drilling operations for WE3 at the West Erregulla ...

Norway >>  6/27/2022 - The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6607/12-5, cf. Section 13 of the Resource Management ...
Tunisia >>  6/24/2022 - Zenith Energy Ltd. (ZENA) provides an update on operational activities in the Robbana concession ("Robbana"), located onshore Tunisia. ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.