Gulf Oil and Gas accountACCOUNT

Hurricane Energy Spuds Lancaster Well, West of Shetland

Source: www.gulfoilandgas.com 7/6/2016, Location: Europe

Hurricane Energy plc, the UK-based oil and gas company focused on hydrocarbon resources in naturally fractured basement reservoirs, announces that the 205/21a-7 well on the Lancaster field, West of Shetland, was spudded at approximately 01.35 hrs on 6 July 2016, using the Transocean Spitsbergen drilling rig. The well is located on licence P1368 Central in which Hurricane has a 100% interest.

The 205/21a-7 Pilot Well (the "Pilot Well") is the first in a two-well programme designed to refine the Lancaster resource range, provide a second future production well and provide new information to help optimally plan the Lancaster field development.

The Pilot Well's objectives are to:

(1) confirm the depth of oil water contact (OWC) - to help refine Hurricane's estimate of Lancaster's resources by determining the height of the oil column;

(2) evaluate the properties of a potential aquifer - to help refine Hurricane's estimate of recoverable oil by confirming the presence of a basement aquifer and its potential to provide pressure support to the overlying oil column; and

(3) evaluate the Victory sandstone resource range - to assess the potential for material resource upside in the Victory sandstone overlying the basement.

The Pilot Well will be drilled, extensively logged and tested, then permanently plugged and abandoned by filling with cement. Immediately thereafter the 205/21a-7z 1km Horizontal Sidetrack Well (the "Horizontal Well") is expected to be commenced.

The Horizontal Well's objectives are to:

(1) reconfirm production rates achieved in the 2014 horizontal well - to demonstrate that other parts of the reservoir can also deliver commercial flow rates;

(2) further quantify the reservoir characteristics through shut-in/pressure build-up tests - to help ascertain if there are any reservoir barriers as well as improve understanding of how the reservoir fracture system performs; and

3) provide a second production well ahead of the Early Production System.

The combined well operations, referred to as the Lancaster 7 Wells, are expected to last approximately four months after which there will be a period of data analysis. A further announcement will be made in due course.

Dr Robert Trice, CEO of Hurricane, commented:

"This is an extremely exciting moment in Hurricane's development as we embark on a drilling programme that will not only complete the remaining well stock required for an Early Production System, but will also help refine our Contingent Resource range for Lancaster - currently 62-456 MMboe - and thereby facilitate a final investment decision and help us better plan for the field development. We look forward to reporting on operations in due course."

Drilling News in United Kingdom >>

Egypt >>  6/3/2019 - Rockhopper Exploration plc, the oil and gas company with key interests in the North Falkland Basin and the Greater Mediterranean region, is pleased to...
Norway >>  5/24/2019 - MOL Norge, operator of production licence PL 539, is in the process of concluding the drilling of wildcat well 3/7-11 S. The well was drilled about 7 ...

Australia >>  5/21/2019 - JV partner Carnarvon Petroleum has provided an update on the drilling of the Santos-operated Dorado-2 well. Since the last report the 12-1/4” hole has...
Egypt >>  5/21/2019 - Dana Gas PJSC, the Middle East's largest regional private sector natural gas company, has commenced drilling operations on 20 May at its Merak-1 well,...

Australia >>  1/29/2019 - JV partner Carnarvon Petroleum has announced that operator Santos will drill the Roc-South-1 exploration well in 2019. The well will be drilled immedi...
Azerbaijan >>  1/29/2019 - • SOCAR conducted over 160,000 meters of drilling work in the year1 ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


United Kingdom Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.