Gulf Oil and Gas accountACCOUNT

41,705 Meters Drilling of Oil&Gas Wells in H1 of 2016

Source: Shana 11/3/2016, Location: Asia

Director of the Onshore Drilling Operations Department at the National Iranian Drilling Company (NIDC) Saeed Akbari says 41,705 meters drilling was recorded in the first half (March 20-September 21) this year (started on March 20).

Akbari said the drilling was in the areas covered by the National Iranian South Oil Company (NISOC) and the Exploration Department of the National Iranian Oil Company (NIOC).

He said an exploration well, 10 developmental wells, and four other wells were repaired in the first half of this year by the NIDC Onshore Drilling Management Department staff.

He added that his department is now availed with 16 light and heavy drilling rigs. "Out of the rigs, two are employed for drilling the exploration-descriptive, 11 for drilling the developmental wells and three for repair of wells."

The Fath 67 drilling rig alone drilled 4,311 meters in the period and Fath 95 drilling rig joined the fleet in May this year, he concluded.

Drilling News in Iran >>

Norway >>  7/2/2020 - PSA has given Equinor consent for exploration drilling in block 34/7 in the North Sea.

Operator: Equinor Energy AS
...

United States >>  7/2/2020 - Legacy Exploration, a privately held oil and gas company located in Dallas, Texas has announced that it will commence drilling operations for two hori...

Egypt >>  7/1/2020 - Eni (as the Operator of the Block), BP and Total (as Contractor members) have successfully drilled the first exploration well in the North El Hammad l...
Norway >>  7/1/2020 - We have given ConocoPhillips consent for exploration drilling in block 6507/4 in the Norwegian Sea.

Operator: ConocoPhillips
Well na...


Norway >>  7/1/2020 - We have given Wellesley consent for exploration drilling in block 6204/11 in the Norwegian Sea.

Operator: Wellesley Petroleum AS
Wel...

Australia >>  6/30/2020 - Oilex has advised that the South Australian State Government has announced the successful bid for Block CO2019-C (PELA677) in the Cooper Eromanga Basi...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 |

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.