Koltogorsky Exploration Well Spud

Source: www.gulfoilandgas.com 4/10/2008, Location: Asia

Sibir announced that it has spudded the second of seven exploration wells scheduled as part if its 2008 drilling campaign on the Koltogorsky exploration licenses. This well was spudded in block 11 and is planned to reach a total depth of 3,200 meters by late May 2008. An additional four wells are planned to be completed and a further two spudded by year end.

Infrastructure development has proceeded apace with 56.5 kilometres of both paved and winter ice roads now completed. Four new drill pads have been constructed and four drilling rigs mobilised. Construction of a fifth well pad and mobilisation of a fifth drilling rig is planned for the end of April.


Australia >>  5/13/2021 - Highlights
• Canning Basin exploration drilling campaign targeting a total 97 million barrels of conventional oil (mean prospective resources)1 ...

Argentina >>  5/10/2021 - Interoil is pleased to announce that Velitec’s Work Over rig has been mobilized, fully rigged-up, certified and has started operation in the MMO-15 we...

Norway >>  5/10/2021 - Reference is made to OKEA press releases of 18[th] February and 23[rd] March. ...
Norway >>  5/10/2021 - Please be advised that Equinor has exercised one additional well to the Deepsea Atlantic contract. The well has been exercised under the Continued Opt...

United States >>  5/7/2021 - U.S. Oil & Gas Plc, (“USOIL”), the oil and gas exploration company with assets in Nevada, is pleased to make the following announcement: ...
Colombia >>  5/6/2021 - Canacol Energy Ltd. ("Canacol") (CNE) is pleased to provide the following information concerning its April 2021 natural gas sales and drilling progra...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.