Hydro Group Successfully Completes Significant MeyGen Contract

Source: www.gulfoilandgas.com 3/30/2017, Location: Europe

Aberdeen-based subsea cable and connector specialist, Hydro Group has completed a major contract with technology developer and supplier of tidal turbines, Andritz Hydro Hammerfest (AHH). The agreement saw Hydro Group supply complete connection systems for three turbines on the world’s most advanced multi-turbine tidal stream energy development.

This second MeyGen contract followed on from an announcement in November 2015 regarding a contract with Atlantis Resources - 86% owner of MeyGen Limited - for which Hydro Group supplied the complete export connection system for one of the tidal turbines. This most recent contract win saw Hydro Group (contracted by AHH), supply the complete connection system for the remaining three turbines.

As part of phase 1A of the ground-breaking 398MW tidal array project, four submerged turbines, generating 6MW, have been installed in the Pentland Firth, Scotland, with more than £50million having been raised to finance the initial stage.

Doug Whyte, managing director at Hydro Group said: “This significant MeyGen project is further testament that Hydro Group is seen as a major operator and supplier to the renewable energy markets. With several decades of renewable energy industry experience behind us, Hydro Group is at the forefront in the development of cables, terminations, connectors and junction boxes, with involvement from the initial prototype stage through to design and manufacture.”

The scope of work involved Hydro Group providing the connection management system and interfacing the export cable up to the nacelle, including the dynamic cable, the in-board connection system and the mechanical loading system, transmitting a power output of 1.5MW at 4.0kV per turbine and incorporating fibre optic links.

Mr Whyte continued: “As offshore installation costs are the highest in any marine infrastructure, minimising those costs has been a strong focus for us. We design our systems to mate and de-mate (connect and disconnect) in less than one hour to ensure offshore installation cost is reduced.

“Further to this, Hydro Group’s system is designed for minimal maintenance and operational costs with in-built corrosion protection, resulting in a system that has 25 years’ service life.”

The MeyGen project has the potential to provide clean, sustainable, predictable power for 175,000 homes through a network of 269 tidal turbines secured to the seabed, with the first power to the national grid delivered late 2016.

“The tidal array is the first of its kind in the world, making for one of the most innovative renewable energy projects, and we are delighted MeyGen selected Hydro Group to play a key role supporting this initiative”, concluded Mr Whyte.

Involved from prototype concept through to design, manufacture and project management, Hydro Group manufactures the complete package including FAT at its state-of-the-art facilities in Aberdeen, Scotland; umbilical cables, electrical and optical connection systems/assemblies for data, power and signal transmission.


Canada >>  6/17/2022 - Capstone Green Energy Corporation, a global leader in carbon reduction and on-site resilient green energy solutions, announced that Horizon Power Syst...
United States >>  6/17/2022 - Rivian announced plans for a large-scale wind turbine at its Normal manufacturing campus that is intended to provide clean energy to enable new R1 veh...

United States >>  6/17/2022 - Rivian announced plans for a large-scale wind turbine at its Normal manufacturing campus that is intended to provide clean energy to enable new R1 veh...
Colombia >>  6/16/2022 - The Nordex Group wins orders in Colombia: Celsia Colombia S.A., an electricity producer and distributor, has ordered 63 N155 turbines with a total of ...

Netherlands/Holland >>  6/16/2022 - The Hollandse Kust Zuid offshore wind farm in the Netherlands will use a new type of wind turbine blades that can be recycled. The blades are made wit...
Belgium >>  6/15/2022 - On the occasion of Global Wind Day, Belgian politicians – Governor of East Flanders Carina Van Cauter, Deputy Prime Minister and Minister of the North...

Related Categories: Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Hydro  Turbines: Steam 

Related Articles: Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Hydro  Turbines: Steam 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.