Premier Oil announces successfully Chim Sao North appraisal well in Vietnam

Source: www.gulfoilandgas.com 5/20/2008, Location: Asia

Premier Oil announced it has successfully completed drilling and testing of the Chim Sao North appraisal well (12W-CS-2X) on Block 12W in Vietnam. The target Middle Dua sand sequence was encountered as prognosed. Following successful coring of the reservoir and wireline logging operations, two reservoir zones were drill stem tested.

The first zone tested flowed oil at a sustained rate of 1650 barrels of oil per day ("bopd") plus 1.4 million standard cubic feet of gas per day ("mmscfd") on a 40/64th inch choke. The second zone tested flowed oil at a sustained rate of 2680 bopd plus 2.1 mmscfd on a 48/64th inch choke. No water was produced on either test. The well will be suspended as a future producer and the rig Wilboss will move to the Chim Ung prospect (formerly known as Falcon).

Premier is the operator of Block 12W with a 37.5% interest. Premier’s partners in the block are Santos (37.5%) and Delek Energy (25%). The Chim Sao field was discovered by Premier in 2006. Chim Sao is being progressed for development with first oil anticipated in mid 2010.


Russia >>  5/12/2022 - Shell Overseas Investments B.V. and B.V. Dordtsche Petroleum Maatschappij – subsidiaries of Shell plc – have signed an agreement to sell Shell Neft LL...
Russia >>  4/27/2022 - As of the end of the working day on April 26, Gazprom Export did not yet receive from Bulgaria's Bulgargaz and Poland's PGNiG payments for the gas sup...

Related Categories: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 

Related Articles: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.