Gulf Oil and Gas accountACCOUNT

Icewine Well’s Stimulation Fluid Continues to Flowback Naturally

Source: www.gulfoilandgas.com 7/10/2017, Location: North America

88 Energy Limited (88 Energy, Operator) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska.

Highlights

• Stimulation fluid has continued to flowback naturally
• ~16% of total stimulation fluid recovered to date
• Shut in planned for 6 weeks

Icewine#2 Operations Update

Flowback operations have continued, with fluid composition comprising 100% water. After analysing the performance of the well to date, and comparing to results from other plays, a decision has been made to shut the well in for six weeks to allow for pressure build up and imbibition to occur. Imbibition (or soaking) has proven to be effective in other plays by allowing frac fluid to be absorbed, displacing in-situ water that may be blocking hydrocarbon molecules from being able to flow through the reservoir.

Post the shut in period, the well may then be swabbed.

Further analyses are required to determine the impact, if any, of the performance of the Icewine#2 well on the probability of success for the HRZ play at the Franklin Bluffs location and over the wider acreage position.

Further updates will be made as and when appropriate throughout the testing program.

Cementing, Stimulation >>

Cementing, Stimulation News in United States >>

United States >>  5/22/2019 - Sempra Energy (SRE) and Saudi Aramco announced their respective subsidiaries, Sempra LNG and Aramco Services Company, have signed a heads of agreement...
United States >>  5/21/2019 - With reference to announcements on 2 May 2019, TGS-NOPEC Geophysical Company and Spectrum have announced that their respective board of directors have...

United States >>  5/9/2019 - Anadarko Petroleum Corporation has entered into a definitive merger agreement with Occidental Petroleum Corporation under which Occidental will acquir...
United States >>  5/7/2019 - TechnipFMC (FTI) has been awarded a significant integrated Engineering, Procurement, Construction and Installation (iEPCI) contract by BP for the Thun...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


United States Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.