Gulf Oil and Gas accountACCOUNT

Candax Commences Ezzaouia Drilling Onshore Tunisia

Source: www.gulfoilandgas.com 7/30/2008, Location: Africa

Candax Energy announced that the drilling of the onshore Ezzaouia 17 well commenced today. The well targets an un-drilled fault block in the east section of the field. Following the completion of the Ezzaouia 17 well, the rig will move to the second infill location, Ezzaouia 18, and following that well, it will move to Chaal.

In addition, the Company has completed its first equity tanker lifting of crude oil for 2008 during the last week of May lifting approximately 120,000 barrels net to Candax.

The Tunisian Government has confirmed the two year extension of the first exploration period of the Chaal Permit, with no additional work commitments. The drilling of the Chaal-1 side-track well and test program is scheduled to commence in late August / early September 2008.

Drilling News in Tunisia >>

Turkey >>  2/20/2019 - Valeura Energy Inc., the upstream natural gas producer focused on appraising and developing an unconventional gas accumulation in the Thrace Basin of ...
Australia >>  2/19/2019 - Equinor has released its draft Environment Plan (EP) for the proposed Stromlo-1 exploration drilling program in permit EPP 39 in the Great Australian ...

Norway >>  2/19/2019 - Faroe Petroleum Norge, operator of production licence PL 740, has concluded the drilling of appraisal wells 31/7-3 S and 31/7-3 A. The wells were dril...
Australia >>  2/18/2019 - Galilee Energy has provided an update on the upcoming drilling operations at its 100% owned and operated Glenaras multi-lateral pilot programme locate...

Mexico >>  2/13/2019 - Rowan Companies plc (RDC) announced that ExxonMobil has exercised the third of four options for the Rowan Relentless, an R-Class ultra-deepwater drill...
Botswana >>  2/12/2019 - Tlou Energy Limited, the ASX, AIM and BSE listed company focused on delivering power in Botswana and southern Africa through the development of coal b...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 |

Oil & Gas Projects in Tunisia >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.