Energean Signed Drilling Contract with Stena Drilling for Karish Field

Source: www.gulfoilandgas.com 1/29/2018, Location: Middle East

Energean Oil & Gas is pleased to announce that Energean Israel has signed a contract with Stena Drilling for the development drilling of the Karish Field, offshore Israel.

Pursuant to the contract, Stena Drilling will deploy the Stena Forth drillship (or such substitute as may be agreed by the parties) to drill three development wells in Q1 2019 (with provision made for further options), subject to Energean’s Final Investment Decision (FID) regarding the Karish and Tanin fields.

The Stena Forth, one of the DrillMAX Fleet vessels, is a DP Class 3 ultra-deep water drillship with a track record in world-wide operations, ranging from the Mediterranean (Libya), Egypt (Gulf of Suez), Malaysia, Greenland and the US (Gulf of Mexico).

The Stena Forth will be mobilised from Las Palmas, Spain, where she is currently located. The Karish development programme includes the drilling of three development wells and production from a new Floating Production, Storage and Offloading (FPSO) vessel, approximately 90km offshore. First gas is expected in 2021.

Stena Drilling is headquartered in Aberdeen, Scotland, and is one of the world’s leading independent drilling contractors, a wholly-owned subsidiary of Stena AB, Gothenburg, Sweden.

Energean considers this to be a significant step in the development of Karish and part of a development plan which targets supplying gas to the growing Israeli gas market. Stena Drilling’s calibre, experience and safety record was crucial in making this decision, given Energean’s commitment to achieving the highest standards of HSE performance and the requirement to operate in line with or exceed the European Directive on Safety of Offshore Oil & Gas Operations, as implemented by the UK safety directive.


Egypt >>  5/18/2022 - SDX Energy Plc (SDX) is pleased to announce the spudding of the MSD-24 infill development well on the Meseda field. This well is the fourth in a fully...
Australia >>  5/16/2022 - Highlights
- Drilling of Glenaras 28 complete
- Well encountered 27m of gassy coals
- Steps underway to mitigate impact of further uns...


United Kingdom >>  5/13/2022 - UK Oil & Gas PLC has announced that the North Sea Transition Authority (formerly the Oil and Gas Authority) has granted a one-year extension to the ag...
Australia >>  5/12/2022 - Western Gas has provided an operational update on the drilling of the Sasanof-1 exploration well and will issue further updates upon the completion of...

Norway >>  5/12/2022 - Aker BP ASA, operator of production licence 685, has concluded the drilling of wildcat well 35/4-3.

The well was drilled about 20 kilometre...

Tunisia >>  5/12/2022 - Serinus Energy plc (“Serinus”) (SENX) is pleased to announce its interim results for the three months ended 31 March 2022. ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.