Jura Energy Spuds Sadiq Development Well

Source: www.gulfoilandgas.com 8/27/2008, Location: Asia

Jura Energy Corporation announced that the drilling of the Sadiq 2 well commenced on August 26, 2008. The Sadiq 2 well is located in Block 22 in the Central Gas Basin of Pakistan and has been designed as a development well to target the Sui Main Limestone Reservoir at a depth of 1,104 meters; the well is expected to take 30 days to drill and will be tied into the existing gas processing facilities after an anticipated 8 day testing program.

Sadiq 2 will be the third well drilled within Block 22 since September of 2007, and follows the successful drilling and completion of Hasan 3 in October 2007 and Khanpur 2 in January 2008. Both Hasan 3 and Khanpur 2 have been on production since early 2008.

Jura holds a 10.5% participating interest in Block 22 through its subsidiary, Pyramid Energy International.


Germany >>  6/30/2022 - Drilling has started at Neptune Energy's operated Adorf Z17 gas appraisal well in the Georgsdorf municipality in northwest Germany, the company said. ...
Namibia >>  6/28/2022 - Reconnaissance Energy Africa Ltd. (“ReconAfrica”) and its joint venture partner NAMCOR (the state oil company of Namibia) are pleased to announce spud...

Norway >>  6/28/2022 - The Norwegian Petroleum Directorate (NPD) has granted ConocoPhillips Skandinavia a drilling permit for well 25/7-10 in production licence PL782 S.
...

Australia >>  6/27/2022 - On behalf of the EP469 JV, Strike Energy Limited (Strike - STX) offers an update on the appraisal drilling operations for WE3 at the West Erregulla ...

Norway >>  6/27/2022 - The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6607/12-5, cf. Section 13 of the Resource Management ...
Tunisia >>  6/24/2022 - Zenith Energy Ltd. (ZENA) provides an update on operational activities in the Robbana concession ("Robbana"), located onshore Tunisia. ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.