Real Energy spuds Tamarama-2 well, Cooper Basin

Source: www.gulfoilandgas.com 4/16/2018, Location: Not categorized

Cooper Basin focused oil & gas exploration company Real Energy has advised that Tamarama-2 well spudded at 3.00 pm Friday 13 April 2018. The well was drilled to the depth of 710 metres RT (below Rotary Table) and surface casing was run and cemented to 708 metres RT. Current operations as at 6.00 am on 16th April 2018, are pressure testing the Blow Out Preventers prior to drilling out the production hole.

Tamarama-2 well is part of a two-well gas appraisal program designed to prove commercial gas flow. If the wells are successful, Real Energy will look to establish pilot production out of the wells and look to connect flow lines so that sales gas can then be supplied into Australia’s East Coast gas market.

Real Energy is implementing the Research & Development it has gathered from the drilling, testing and fracture stimulation from Tamarama-1, and this knowledge and methods are being used to in the drilling program for a deviated well design suitable for multi-stage fracs for both wells.

These wells represent a major value catalyst to potentially convert Real Energy’s contingent resources into reserves, and ultimately into production. The other aim is to start proving up the delivery of the basin centred gas play within ATP927 which has a prospective resource estimated by De Golyer & Mac Naugton to be 13.7 Trillion Cubic Feet of gas initially in place.


Cuba >>  5/23/2022 - Melbana Energy Limited is pleased to provide this update on its two well exploration drilling program in its Block 9 contract area, onshore Cuba (Melb...
Norway >>  5/23/2022 - The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 6507/3-15 and well 6507/3-16, cf. Section 13 of the Resourc...

Norway >>  5/23/2022 - The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 30/3-11 S, cf. Section 13 of the Resource Management ...
Canada >>  5/19/2022 - PetroTal Corp. is pleased to announce that Q1 2022 results will be released on May 26, 2022, along with an extended investor webcast. Additionally, th...

Egypt >>  5/18/2022 - SDX Energy Plc (SDX) is pleased to announce the spudding of the MSD-24 infill development well on the Meseda field. This well is the fourth in a fully...
Australia >>  5/16/2022 - Highlights
- Drilling of Glenaras 28 complete
- Well encountered 27m of gassy coals
- Steps underway to mitigate impact of further uns...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.