Gulf Oil and Gas accountACCOUNT

Two Key Factors to Achieve Development Objectives in South Pars

Source: www.gulfoilandgas.com 5/5/2018, Location: Asia

The deputy of NIOC mentioned complete timing observance and strict monitoring as two significant factors in obtaining south pars development objectives.

Gholam Reza Manocheri, NIOC's deputy in engineering affairs, visited south pars refineries of phases 13, 14, and 22-24 as well as pipeline between phases 12 and 14 on Wednesday. Meanwhile in a meeting with the presence of pars oil and gas company managing director, the latest conditions and the amount of progress made in onshore and offshore facilities were presented by the directors of developing phases, public relations reported.

Referring to the need for precise planning and integrated cooperation between contractors and POGC, Manocheri said "to meet development plans commitments, due to high volume of work, the employer is required to observe the timeline and monitor various stages of the project precisely.

In this regard, by launching the first phase of production chain of remaining projects, daily production will be totally increased to 3 billion cubic feet (equivalent of 84 million cubic meters) by the half of current Iranian calendar (by the end of summer).

Monitoring & Control News in Iran >>

Azerbaijan >>  12/6/2018 - Petrofac’s Engineering & Production Services (EPS) East division has secured an operations and maintenance support services contract with Trans Adriat...
Azerbaijan >>  12/6/2018 - Honeywell announced today that the State Oil Company of Azerbaijan Republic (SOCAR) will use Honeywell UOP’s Pressure Swing Adsorption (PSA) technolog...

India >>  11/30/2018 - Great Eastern Energy Corp (GEECL) will invest up to USD 2 billion over the next 10 years in its Raniganj (south) block in West Bengal to exploit shale...
Indonesia >>  11/26/2018 - Japan Drilling Co., Ltd. (JDC) is pleased to announce that its subsidiary company "P.T. Japan Drilling Indonesia" together with a shipping company in ...

Azerbaijan >>  11/18/2018 - Leading international oilfield services company, Expro, has strengthened the opening of its new purpose-built facilities in Baku, winning a four-year ...

Related Categories: Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Concentration  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Float Switch  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Load cells  Monitoring & Control  Mud Control  Mud Logging  pH and REDOX  Pressure gauges/ Transmitters  Radiation Detection  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transducers  Transmitters  Transmitters, Pressure  Turbidity Meters  Viscosity  Weather Station  Weighing Equipment 

Related Articles: Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Concentration  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Float Switch  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Load cells  Monitoring & Control  Mud Control  Mud Logging  pH and REDOX  Pressure gauges/ Transmitters  Radiation Detection  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transducers  Transmitters  Transmitters, Pressure  Viscosity  Weather Station 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.