Additional Production Capacity Added at Faregh Oil Field

Source: www.gulfoilandgas.com 1/8/2019, Location: Africa

Waha Oil Company (WOC), a National Oil Corporation subsidiary, has completed preparations on another horizontal well in the Faregh oil field ahead of the planned start of second-phase experimental gas production by the end of the first quarter of 2019.

Initial tests indicate that the B B-14-59 well is expected to produce up to 24 million cubic feet of gas, and 1500 barrels of condensate per day (bcpd), using a 64/64-inch wellhead choke.

This well is in addition to the expected 33 million cubic feet of gas, and 1400 bpcd production capacity of well B B-10-59, completed in November 2018.

NOC chairman, Eng. Mustafa Sanalla thanked staff dedicated to this project and underlined the importance of a refocused Faregh field to provide gas for local community use, and the fostering of further regional economic development.

For more information about related Opportunities and Key Players visit North Africa Projects


Australia >>  7/1/2022 -  WE3 has confirmed the high-quality conventional gas resource in the northern extent of the West Erregulla gas field in the Kingia Sandstone.
...

Turkey >>  6/30/2022 - UK Oil & Gas PLC has been advised by Aladdin Middle East ("AME"), the operator of the Company's 50% interest in the Resan Licence, that their field cr...

United Kingdom >>  6/28/2022 - Angus Energy is pleased to announce the conclusion of leak testing and the commencement of commissioning of the Saltfleetby Gas Field. The duration o...
Colombia >>  6/27/2022 - The Rio Cravo Sur-1 ("RCS-1") well testing findings on the Tapir Block in the Colombian Llanos Basin are now available, and Arrow Exploration Corp. (A...

Suriname >>  6/21/2022 - The flow test results from the Krabdagu exploration well (KBD-1) on Block 58 offshore Suriname were released today by APA Corporation (APA). APA Surin...
Egypt >>  6/13/2022 - SDX Energy Plc (SDX) is pleased to announce the completion of drilling at the MSD-24 infill development well on the Meseda field in its West Gharib co...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.