Gulf Oil and Gas accountACCOUNT

PGS Starts New GeoStreamer Acquisition Offshore Republic of Guinea

Source: www.gulfoilandgas.com 3/4/2019, Location: Africa

PGS is currently acquiring an 8 500 sq. km MC3D survey offshore the Republic of Guinea. Fast-track data will be available in the second quarter of 2019.

PGS expands its footprint within the MSGBC Basin (Mauritania, Senegal, The Gambia, Guinea Bissau and Guinea Conakry) with a MultiClient 3D GeoStreamer survey offshore the Republic of Guinea measuring approximately 8 500 sq. km. Acquisition commenced in February of this year and is due to complete in the second quarter of 2019. A fast-track product will be available approximately 4 weeks after last shot.

Optimal Design, Direction, and Location
Titan-Class vessel, Ramform Atlas, is acquiring the survey with a tripe source technology using a spread of 12 GeoStreamers with 8km streamer length configuration. Data acquisition direction is NE-SW, perpendicular to both the present day shelf edge and the underlying regional subsurface structures, enabling optimal illumination of exploration targets.

The new survey will extend 3D imaging into the Republic of Guinea covering blocks A4 and A5 and promises to reveal a major transform zone of the successful paleo shelf-edge play that exists along the MSGBC region.

Full Imaging and Fast-track Data
Fast-track data will be available in Q2 2019. Final processing will include full fidelity prestack time and depth migrated products, expected to be available towards the end of 2019. The full suite of products will offer both immediate and longterm value in the subsurface analysis of the region.

For more information about related Opportunities and Key Players visit West Africa Projects

Seismic survey News in Guinea >>

Australia >>  4/11/2019 - Shearwater GeoServices Holding AS (Shearwater) is pleased to announce the award of a multi-project marine seismic 3D and 4D acquisition contract by Sh...
Australia >>  4/11/2019 - Shearwater GeoServices has announced the award of a multi-project marine seismic 3D and 4D acquisition contract by Shell International Exploration & P...

Gabon >>  4/10/2019 - Acquisition of CGG’s 9,800 km long-offset broadband 2D multi-client seismic survey in the highly prospective Gabon South Basin has been completed. Fas...
Russia >>  4/10/2019 - A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Sergey Gorkov, Director General, Chairman of the Board of R...

Zimbabwe >>  4/10/2019 - Invictus Energy Limited, is pleased to announce that it has received the final processed seismic data from the processing contractor for its Cabora Ba...
Norway >>  4/9/2019 - Shearwater GeoServices has announced the award of a contract for a Barents Sea seismic acquisition survey with full data processing by the Norwegian P...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Guinea Oil & Gas 1 >>  2 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.