JAPEX Commenced Production at Kangean TSB Phase 2

Source: www.gulfoilandgas.com 3/19/2019, Location: Asia

Japan Petroleum Exploration (JAPEX) has announced that the Sirasun and Batur gas fields, which are part of the TSB gas complex in the Kangean block in the Republic of Indonesia, commenced the production of natural gas on March 10.

JAPEX has been participating in the development and production of natural gas in Kangean block located offshore East Java in Indonesia since 2007, through Kangean Energy Indonesia which is the operator of the block. In TSB gas complex of Kangean block, Terang gas field has been producing natural gas since May 2012. Its produced gas is processed at the FPU and is supplied to a national fertilizer plant, a national electric power company, and others near Surabaya in East Java.

The TSB gas complex is located offshore, 90 kms north of Bali Island, with a water depth of 90 to 230 meters, and consists of the three gas fields, which are Terang, Sirasun, and Batur. Following the gas production from Ter ang in 2012, in order to maintain production volume in the block for mid to long term, the development work of Sirasun and Batur gas fields has been promoted since 2014 as 'TSB Phase 2,' and its gas production has commenced this time.

The Sirasun and Batur gas fields are planned to produce at a maximum of 5.0-5.1 million cubic meters per day (175-180 million cubic feet per day) of natural gas. Together with Terang gas field which is currently in production, TSB Phase 2 will continuously contribute to the stable natural gas supply to the local clients.

The JAPEX group will continue to make contributions to the development and production of Kangean block with its knowledge and expertise in the E&P business, and will endeavor to maximize its corporate value by applying the experience of offshore development in this block to its other projects.


Colombia >>  1/17/2025 - GeoPark Limited (“GeoPark”) (NYSE: GPRK), a leading independent energy company with over 20 years of successful operations across Latin America, annou...
Mongolia >>  1/16/2025 - Petro Matad Limited (AIM: MATD), the AIM quoted Mongolian oil company, provides the following update on production operations at the Heron-1 well in i...

United Kingdom >>  1/16/2025 - - Production from the Saltfleetby Field in the Fourth Quarter of 2024 was 517 million standard cubic feet of natural gas and 9,387 barrels of gas c...
Mongolia >>  1/13/2025 - ? Initial gas flows from the three new pilot production wells (LF-04, LF-05 and LF-06) has commenced in line with expectations
? Coupled with th...


Brazil >>  1/10/2025 - BRAVA ENERGIA S.A. (“BRAVA” or “Company”) (B3: BRAV3), informs its investors and the market in general of the preliminary and unaudited production dat...
United States >>  1/10/2025 - Prairie Operating Co. (the “Company” or “Prairie”) announced the on-time completion of its initial eight-well Shelduck South pad in the DJ Basin and i...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.