Lower Achimov Development Confirmed

Source: www.gulfoilandgas.com 7/12/2019, Location: Asia

PAO NOVATEK announced that Arcticgas, a joint venture between NOVATEK and PAO Gazprom Neft, successfully completed a horizontal well number “U2802” targeting the lower Achimov formation at the Urengoyskoye field.

An eight-stage hydro-fracturing program was successfully completed utilizing a record-high proppant volume of 2,187 tons at well number “U2802” with a total length of 5,624 meters and a horizontal section of 1,500 meters. A unique wireless inflow monitoring technology using marked proppant was implemented. Permanent downhole pressure and temperature gauges are also used in the production to monitor real-time data.

Utilizing state-of-the-art technologies the well achieved a daily flow rate of more than one million cubic meters of natural gas and 500 tons of gas condensate, confirming significant prospect to develop the lower Achimov deposits.


India >>  5/10/2021 - Technip Energies (TE) has been awarded a large Engineering, Procurement, Construction and Commissioning (EPCC) contract by Indian Oil Corporation Limi...
Russia >>  4/28/2021 -  PAO NOVATEK (“NOVATEK”) announced that its joint venture OOO Arctic LNG 2 (“Arctic LNG 2”) concluded 20-year LNG Sales and Purchase Agreements (SPAs)...

India >>  4/26/2021 - - EPCC contract awarded by Indian Oil Corporation Limited for the implementation of a new Para-Xylene plant in Paradip, in the state of Odisha, in Eas...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.