Gulf Oil and Gas accountACCOUNT

Third Deck Successfully Installed in SP14

Source: www.gulfoilandgas.com 7/15/2019, Location: Asia

The third deck of south pars phase 14 was installed in its own position successfully.

Having operated the two first platforms of phase 14, namely 14A and 14C, with production capacity of 28 mcm a day, the third deck called 14B was successfully installed with the attempt of Iranian experts on joint reservoir in Persian Gulf sea, public relations reported.

Phase 14 director, Mohammad Mehdi Tavasolipour, said that this structure had been built by Iran Shipbuilding & Offshore Industries Complex (ISOICO) in Bandar Abbas. It would generate 14.2 mcm of sour gas a day from south pars gas field.

The mentioned deck was transferred by the carrier vessel called Tondgoyan and installed by HL5000 on its own jacket.

In general, the platform includes 7000-kilometer-long cabling as well as 35000-inch-diameter piping which has achieved 96 percent of physical progress so far.

Development News in Iran >>

Indonesia >>  10/9/2019 - Australian-based, Indonesian oil producer, Bass Oil Limited (BAS) is pleased to provide its monthly operations update for September 2019. Total field ...
Iran >>  10/9/2019 - Iranian Minister of Petroleum Bijan Zangeneh said there had been talks with a number of domestic firms to develop the South Pars Oil Layer (SPOL), how...

Libya >>  10/9/2019 - A delegation from National Oil Corporation (NOC) met Petrofac representatives at the company’s London headquarters, on the sidelines of the Oil & Mone...
Russia >>  10/9/2019 - Messoyakhaneftegaz has commissioned a horizontal well at the Vostochno-Messoyakhskoye field, facilitating the full-scale development of Achimovsky dep...

Australia >>  10/7/2019 - Transborders Energy (Transborders) is pleased to announce it has entered into a Joint Study Agreement with Mitsui O.S.K. Lines, Ltd. (MOL) to together...
Azerbaijan >>  10/4/2019 - Saipem, in consortium with Boshelf LLC and STAR GULF FZCO, has recently been awarded three new contracts by BP for the development of the Azeri-Chirag...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Water Supply Services  Welding Products/Services 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |

Oil & Gas Projects in Iran >>

More News

Related Links

Gulf Oil and Gas
Copyright © 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.