Gulf Oil and Gas accountACCOUNT

Commencement of Well Re-entry Operations on TLP-103CST

Source: www.gulfoilandgas.com 9/11/2019, Location: Africa

Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to announce that well re-entry operations have now commenced at the Tilapia site in Pointe Noire in preparation for drilling the TLP-103C side track, nominated TLP-103CST.

Engineers on site have commenced work to stabilise the well prior to re-entry and the Company has also contracted Wire-Group to supply and install an Isolation Plug which is required to ensure the Company has the necessary barriers in the well and which will enable re-entry. The installation of the Isolation Plug is a rig-less operation, which provides the most cost-effective solution, utilising wireline services from Wire-Group. The isolation plug will be set in preparation for removal of the completion tree which will be replaced by subsurface apparatus more appropriate for drilling and to allow installation of the blow-out preventers ahead of the rig arriving on location.

The Company's management continue discussions with the operators of two potential rigs, both currently situated in the Republic of the Congo, with a view to securing a drilling slot during November.

For more information about related Opportunities and Key Players visit West Africa Projects

Drilling News in Congo >>

Egypt >>  2/14/2020 - SDX Energy Plc is pleased to announce that the SD-6X (Salah) well at South Disouq in Egypt (SDX 55% working interest) has commenced drilling operation...
Egypt >>  2/12/2020 - Italian energy group Edison has begun drilling an exploratory well in deepwater acreage in Egypt, not far from other giant east Mediterranean gas fiel...

Norway >>  2/12/2020 - ConocoPhillips Skandinavia AS, operator of production licence 917, has concluded the drilling of wildcat well 25/7-9 S. ...
United States >>  2/12/2020 - 88 Energy Limited ("88 Energy", 88E) is pleased to provide the following update related to operations for the upcoming Charlie-1 appraisal well, on t...

Angola >>  2/10/2020 - Oceaneering International, Inc. announced the award by units of BP p.l.c. ("BP"), of a contract to provide comprehensive riserless light well interven...
Mexico >>  2/4/2020 - Grupo R has signed a contract with Shell Mexico for the lease of the La Muralla IV platform to operate in the deep waters of the Gulf of Mexico. ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Congo Oil & Gas 1 >>  2 | 3 |

Oil & Gas Projects in Congo >>

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.