Panoro Completes the 2nd Tortue Phase 2 Development Well

Source: www.gulfoilandgas.com 1/22/2020, Location: Africa

Panoro Energy ASA is pleased to announce the successful completion of the DTM-5H well, the second of the phase 2 Tortue development wells on Dussafu permit, offshore Gabon. The well was drilled with the Borr Norve jackup drilling rig in 115.5 m water depth as a horizontal production well in the Gamba reservoir. A long horizontal section of good quality oil saturated Gamba sands was drilled and completed and the subsea tree installed ready for hook up. The rig has now moved on location and spud the DTM-6H, the third of the four phase 2 production wells. First production from the phase 2 Tortue wells, DTM-4H and DTM-5H, is planned for March 2020 with all four phase 2 wells expected to be online by June 2020.

For more information about related Opportunities and Key Players visit West Africa Projects


Canada >>  6/17/2021 - Highlights:
Gemini #2 well drilled and rig released
o Drilling time 7 days from spud to rig release
o Drilling costs C$675,000 (~C$...

Nigeria >>  6/17/2021 - San Leon, the independent oil and gas production, development and exploration company focused on Nigeria, notes the announcement made by Decklar Resou...

United Kingdom >>  6/17/2021 - i3 Energy plc, an independent oil and gas company with assets and operations in the UK and Canada, is pleased to announce the following update. ...
Australia >>  6/16/2021 - - Vali-3 at 2,377 metres in top section of Toolachee Formation
- Gas shows observed in mid-Nappamerri Formation
- Oil shows encountered i...


Gambia >>  6/16/2021 - - Rig contract executed for drilling Bambo-1 exploration well, offshore The Gambia
- Bambo well targeting 1.118 billion bbls of prospective reso...

Norway >>  6/16/2021 - The Norwegian Petroleum Directorate (NPD) has granted MOL Norge AS a drilling permit for well 25/8-22 S, cf. Section 13 of the Resource Management Reg...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.