Gulf Oil and Gas accountACCOUNT

Panoro Completes the 2nd Tortue Phase 2 Development Well

Source: www.gulfoilandgas.com 1/22/2020, Location: Africa

Panoro Energy ASA is pleased to announce the successful completion of the DTM-5H well, the second of the phase 2 Tortue development wells on Dussafu permit, offshore Gabon. The well was drilled with the Borr Norve jackup drilling rig in 115.5 m water depth as a horizontal production well in the Gamba reservoir. A long horizontal section of good quality oil saturated Gamba sands was drilled and completed and the subsea tree installed ready for hook up. The rig has now moved on location and spud the DTM-6H, the third of the four phase 2 production wells. First production from the phase 2 Tortue wells, DTM-4H and DTM-5H, is planned for March 2020 with all four phase 2 wells expected to be online by June 2020.

For more information about related Opportunities and Key Players visit West Africa Projects

Drilling News in Gabon >>

Norway >>  11/23/2020 - Reference is made to the stock exchange notices of 7 July 2020 and 5 October 2020 in which Odfjell Drilling Ltd announced the award of letters of inte...
United Kingdom >>  11/23/2020 - Union Jack Oil plc (UJO), a UK focused onshore hydrocarbon production, development and exploration company is pleased to provide an update on the West...

Australia >>  11/20/2020 - As at 6:00 18 November 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 2410 metres. In the past week we ...
Egypt >>  11/19/2020 - SDX Energy Plc (SDX) is pleased to announce its unaudited financial and operating results for the nine months ended 30 September 2020. All monetary va...

Norway >>  11/19/2020 - The Norwegian Petroleum Directorate has granted Equinor Energy AS a drilling permit for wells 31/1-2 S and 31/1-2 A, cf. Section 15 of the Resource Ma...
Norway >>  11/19/2020 - The Norwegian Petroleum Directorate has granted Equinor Energy AS a drilling permit for wells 31/2-22 S and 31/2-22 A, cf. Section 15 of the Resource ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gabon Oil & Gas 1 >>  2 | 3 | 4 |

Oil & Gas Projects in Gabon >>

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.