Gulf Oil and Gas accountACCOUNT

Oilex prepared for Al Jumd Test Program – Block 56 Oman

Source: www.gulfoilandgas.com 2/25/2009, Location: Middle East

Oilex has today that preparations for the Al Jumd-1 testing program are being finalised and operations are planned to commence on February 26, with the initial flow period planned to be completed around March 6-8.

The Al Jumd-1 exploration well, spudded back in December, discovered oil in the Al Khlata Formation over the interval 1163 - 1328 metres Measured Depth with no oil-water contact identified. The well was suspended for further evaluation. Following in depth analysis of the oil zone using all available well data, 5 zones totalling 46.5 metres were selected for perforation and flow testing. A down hole pump will be run to maximise the recovery rate in the event that heavier crude oil is present.

The participants in the Block 56 Exploration and Production Sharing Agreement are: Oilex Oman Limited (operator) 25%, Videocon Industries Limited 25%, GAIL (India) Limited 25%, Hindustan Petroleum Corporation Limited 12.5% and Bharat PetroResources Limited 12.5%.

Drilling & Well Services >>

Drilling & Well Services News in Oman >>

Saudi Arabia >>  11/13/2019 - Sadara Chemical Company (Sadara) and Baker Hughes have signed agreements through which Sadara will supply feedstock chemicals to a Baker Hughes chemic...
Kuwait >>  11/12/2019 - Honeywell (HON) announced that Kuwait Integrated Petroleum Industries Company (KIPIC) has selected Honeywell Process Solutions (HPS) to be the main au...

United Arab Emirates >>  11/12/2019 - ADNOC LNG has concluded supply agreements with subsidiaries of BP and TOTAL, effectively booking out the majority of its LNG production through Q1 202...
United Arab Emirates >>  11/11/2019 - Penspen has been awarded a prestigious Project Management Consultancy (PMC) framework agreement from the Abu Dhabi National Oil Company (ADNOC). The f...

Oman >>  11/6/2019 - Rex International Holding subsidiary Masirah Oil has announced that it has awarded a drilling rig contract to Foresight Offshore Drilling, to utilize ...
United Arab Emirates >>  11/5/2019 - GMS announces the award of a 4-year contract (firm period) for a K-Class (Small) vessel. GMS's customer is a Middle East national oil company, for whi...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Oman Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |

Oil & Gas Projects in Oman >>

More News

Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright © 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.