First Calgary Petroleums Ltd. Announces Preliminary Results from MZLN-1 Well

Source: www.gulfoilandgas.com 8/24/2004, Location: Africa

First Calgary Petroleums Ltd. (FCP) announces preliminary drilling results from the MZLN-1 well, drilled by FCP on the Ledjmet Block (405b) in Algeria. Initial interpretation of the wireline logs indicates the presence of 74 metres of net hydrocarbon pay over multiple intervals.

Production testing is anticipated to commence within four weeks, subject to equipment availability. MZLN-1, drilled to 4460 metres, is located 5.4 km west of FCP’s recently cased LEC-1 exploration well and 13 km west of the MLE Field. The well was drilled to confirm and extend the hydrocarbon pay identified in the MZL-1 borehole and to explore for new reserves in additional geological horizons. The production testing will target multiple reservoir horizons from the Lower Devonian to the Triassic-age sandstones.

The production testing of the LEC-1 well is continuing with final results expected in September. LEC-1 was drilled on a structural closure 8 km west of the MLE Field and has 42 metres indicated hydrocarbon pay on logs.



Namibia >>  6/28/2022 - Reconnaissance Energy Africa Ltd. (“ReconAfrica”) and its joint venture partner NAMCOR (the state oil company of Namibia) are pleased to announce spud...
Norway >>  6/28/2022 - The Norwegian Petroleum Directorate (NPD) has granted ConocoPhillips Skandinavia a drilling permit for well 25/7-10 in production licence PL782 S.
...


Australia >>  6/27/2022 - On behalf of the EP469 JV, Strike Energy Limited (Strike - STX) offers an update on the appraisal drilling operations for WE3 at the West Erregulla ...
Norway >>  6/27/2022 - The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 6607/12-5, cf. Section 13 of the Resource Management ...

Tunisia >>  6/24/2022 - Zenith Energy Ltd. (ZENA) provides an update on operational activities in the Robbana concession ("Robbana"), located onshore Tunisia. ...
Australia >>  6/23/2022 - HIGHLIGHTS
• Drilling of 6 th and final well in programme complete
• Glenaras 29 encountered 27 metres of gassy coals
• Highest risk e...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.