Origin Energy, on behalf of the L14 Joint Venture parties, advises that the Jingemia 12 oil development well was drilled to a total depth of 2,709.5 metres measured depth. The well intersected a hydrocarbon column of approximately 15 metres within the Dongara sandstone. The well was subsequently cased and cemented.
At 0830 hours Western Standard Time today, the well was being prepared for completion as a production well.
Well type and location:
Oil development well, Jingemia field, North Perth Basin, Western Australia (L14)
Jingemia 12 surface location is approximately 80m south of Jingemia 11 surface location. The target location is 150m NNE of the Jingemia 11 intersection with the Dongara Sandstone target horizon.
Surface location
Latitude: 29° 20’ 22.91” S
Longitude: 114° 59’ 18.83” E
Target location
Latitude: 29° 20’ 10.488” S
Longitude: 114° 59’ 44.235” E
Initial Interests
Origin Energy developments Pty Limited: 49.189%
ARC Energy Limited: 44.141%
Victoria Petroleum Offshore Pty Ltd: 5.00%
Norwest Energy NL: 1.278%
Roc Oil (WA) Pty Limited: 0.25%
John K Geary: 0.142%