Production Ramp-Up on Iara with the Start Up of The Second FPSO

Source: www.gulfoilandgas.com 6/26/2020, Location: South America

Total and its partners announce the start-up of the Floating Production Storage and Offloading (FPSO) P-70 of the Iara cluster (Block BM-S-11A), located in the deepwater Santos Basin pre-salt offshore Brazil. With a productive capacity of 150,000 barrels of oil per day, this new unit double the overall production capacity of the Iara cluster – initiated in November 2019 on the Berbigao field with the FPSO P-68 – and will produce the reserve of the Atapu field.

“The ramp-up of Iara's production reflects Total's growth strategy in the Brazilian deep offshore, where the Group focuses on giant projects that produce barrels of oil at competitive cost, resilient in the face of oil price volatility,” said Arnaud Breuillac, President Exploration & Production at Total. “The Group production in the country should reach 150,000 barrels of oil per day by 2025 thanks to ongoing developments on the Iara, Mero and Lapa projects.”

The BM-S-11A license comprises parts of the fields of Sururu, Berbigão and Atapu. Total acquired a working interest of 22.5% in Block BM-S-11A on January 12, 2018 as part of the strategic alliance with Petrobras, becoming a partner alongside operator Petrobras (42.5%), Shell Brasil Petróleo Ltda. (25%) and Petrogal Brasil S.A. (10%).


Australia >>  7/4/2022 - Jadestone Energy plc, an independent oil and gas production company focused on the Asia-Pacific region, provides the following update on operations at...
United Kingdom >>  7/4/2022 - IOG plc, the Net Zero UK gas and infrastructure operator focused on high return projects, has released an updated Investor Presentation incorporating ...

Kuwait >>  6/30/2022 - Dr. Muhammad Abdul Latif Al-Fares, His Excellency the Deputy Prime Minister, Minister of Oil, and Minister of State for Council Affairs, led the State...
Kuwait >>  6/30/2022 - Today, Thursday, the members of the (OPEC +) coalition decided to increase output by 648,000 barrels per day in August. Following the 30th ministerial...

Norway >>  6/30/2022 - The authorities have granted consent to start production from the Nova field in the North Sea. Nova will be developed with two seabed templates, one f...
United Kingdom >>  6/30/2022 - Serica Energy plc, announces that at the Annual General Meeting today, presentations will be made by both the Chairman, Tony Craven Walker, and the Ch...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.