Extension of Contracts for the PSV Vessels Havila Fano & Havila Heroy

Source: www.gulfoilandgas.com 8/5/2020, Location: Europe

Total DK has extended the contracts for the PSV vessels Havila Fano and Havila Heroy from end of existing contracts until 01.06.20. Total DK has 3 optional periods of one month for each vessel.


Israel >>  4/1/2021 - A major milestone has been reached with the lifting of the flare on the FPSO (Floating Production, Storage and Offloading Unit) for Energean’s Karish ...
Australia >>  3/30/2021 - With reference to the stock exchange release dated 23 March 2021.

BW Offshore has announced that Santos and its partners have made Final In...


Australia >>  3/24/2021 - Santos, as operator of the Barossa joint venture, has announced award of the project’s major contract for the construction, connection and operation o...
United Kingdom >>  3/24/2021 - ORE Catapult has warmly welcomed today’s announcement from The Crown Estate that they are launching a new floating wind leasing opportunity in the Cel...

Australia >>  3/23/2021 - BW Offshore is pleased to announce that it has signed a contract with Santos Ltd. for the supply of a FPSO for the Barossa gas field 300 kilometres of...
Singapore >>  3/16/2021 - The topsides lifting campaign for the Liza Unity FPSO was recently completed and a major project milestone was achieved. Thanks to the efforts of the ...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.