Siemens Secures Contratc with EverPower Wind Holdings

Source: www.gulfoilandgas.com 8/18/2020, Location: North America

Siemens Gamesa Renewable Energy announces it has secured a long-term, 10-year contract with EverPower Wind Holdings, Inc. to provide full-scope operation and maintenance services for a total of 95 Senvion MM92-2.05 MW wind turbines at the Howard and Twin Ridges sites. Siemens Gamesa is on track to becoming the largest Senvion service provider in the United States.

As part of the full scope service agreement, the company will provide remote monitoring, supply chain access and specialty tooling, design and engineering support, software updates, and will fully utilize the existing hardware and infrastructure on site to ensure the performance and reliability of the turbines throughout the product lifetime.

This announcement follows the recent 184-MW agreement to provide 10-year, full-scope operation and maintenance services at two other Senvion project sites in North America.

“This is the second major Senvion service agreement that we’ve signed within a short time period in North America. Our Senvion fleet continues to grow and we pride ourselves on the service continuity we can provide to our customers,” said Juan Gutierrez, Service CEO of Siemens Gamesa. “With the recent acquisition of Senvion’s European Service assets and Intellectual Property, we are uniquely positioned to provide the best operations and maintenance services to the Senvion fleet both inside and outside of Europe,” he added.

Siemens Gamesa acquired Senvion’s Onshore European service assets and Intellectual Property (IP) in early January 2020, which has expanded the company’s multibrand service portfolio to more than 10 GW globally and enabled the company to obtain the knowhow of Senvion turbine technologies. In total, the company has now secured more than 1 GW of service agreements for Senvion projects outside of the acquisition scope in North America, Australia and Europe.

With nearly 72 GW under service globally, Siemens Gamesa is a leading service provider in the industry. In the U.S., Siemens Gamesa provides service and maintenance to wind projects with a total output capacity of more than 13 GW.


France >>  8/9/2022 - As the installation of the wind turbines on the Saint-Nazaire offshore wind farm is underway, Louis Dreyfus Armateurs and Tidal TransitLimited are ple...
Canada >>  8/3/2022 - Capstone Green Energy Corporation (CGRN) secured a follow-on order for two C200S high-pressure natural gas microturbine systems. The customer is a Can...

United Kingdom >>  8/2/2022 - Dagang NeXchange Berhad (“DNeX”), via its subsidiary Ping Petroleum UK PLC (“Ping”), has signed a Memorandum of Understanding (“MoU”) with Cerulean Wi...
Malaysia >>  8/1/2022 - Capstone Green Energy Corporation's distributor in Malaysia and Brunei, Sekito, has secured an order for a 200 kW microturbine-based system for an oil...

Russia >>  7/29/2022 - Concrete was poured for the first wind turbine foundation at the Trunovskaya Wind Farm in the Stavropol Krai (Southern Russia).
<...

China >>  7/21/2022 - Representatives from Van Oord, DNV, and CIMC Raffles attended the commencement ceremony for the Van Oord JUV BOREAS, a wind turbine installation vesse...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.