- APA has commenced Pre-Front End Engineering Design ('Pre-FEED') for the provision of midstream infrastructure and services related to gas that is planned to be produced from the Judith Gas Field following successful appraisal drilling

- Judith Gas Field Dynamic Modelling delivers simulated gas production for the Pre-FEED of:

- 80 Million Standard Cubic Feet per day (MMscfd) sustained across 25 years
- 4 vertical production wells are used at production commencement with an additional 5th well introduced in year 15
- Modelling indicates that a minimum well-head gas delivery pressure of 7000kPa (1050psi) is maintained for at least a 25-year period at a field production rate of 80MMscfd
- Modelling is based on a 450m Gas Column Height within the Static Geological Model used to generate the Judith Resource Statement
- A 465m gas column height was measured in the Longtom Gas Field located in a similar structural setting 15km to the West of Judith
- The 1989 Judith 1 Well drilled downdip of the crest of the Judith structure proved the existence of movable gas and established a 150Bcf Contingent Resource

- Drilling Management Consultants AGR engaged by Emperor Energy have:

- Completed an initial design for the Judith 2 Well to a depth of 3,235m
- Completed a drilling Expressions of Interest (EoI) process with 5 submitted responses
- Established a probabilistic estimation of well costs at $25M for a minimum case with logging and without flow testing
- In a success case Drill Stem Testing (flow testing) will incur additional cost

- Global Seismic Acquisition company CGG have:

- Recently completed a multi-client 3D seismic survey across the offshore Gippsland Basin including the Judith Gas Field
- Preliminary results of this survey will be available to Emperor Energy in late 2020
- 3D Survey was carried out with state-of-the-art equipment and techniques and will provide improved interpretation of Judith Gas Field gas accumulations

Emperor continues to receive growing farm-in interest from potential drilling partners

Commencement of Pre-FEED

Emperor Energy is pleased to advise that APA Group have commenced the Pre-Front End Engineering Design (Pre-FEED) for the provision of midstream infrastructure and services related to gas that will potentially be produced from the Judith Gas Field in the 100% Emperor Energy owned VIC/P47 Permit in the offshore Gippsland Basin, Victoria.

The Pre-FEED study will include:

- Pre-FEED design for a Gas Processing Plant to operate adjacent to and in parallel with the existing Orbost Gas Processing Plant owned by APA

- Pre-FEED concept design for a Subsea Pipeline approx. 40km in length from the Judith gas field to a shoreline crossing

- Pre-FEED design for an export pipeline to the Eastern Gas Pipeline located to the north of the Orbost Gas Plant

- Refinement of indicative project cost estimates and project scheduling

The Pre-FEED study will require 4 months to complete. APA will carry out the work using a balanced combination of both in house and external expertise.

The design basis for the Pre-FEED is 80MMscfd (90TJ/day) of sales gas across a 25-year project life with gas processing to meet the AS4564 gas sales specification.

Emperor Energy and APA established a Memorandum of Understanding (MOU) relating to the Judith Gas Project in October 2019. The Pre-FEED is the first stage of work to progress from the MOU.

Dynamic Modelling

Emperor Energy have revised the Judith Gas Field production well simulation to include 4 x vertical production wells at project commencement with a 5th production well included in Project Year 15.

Each modelled well has 7 perforation zones in gas bearing sands using 5 ½” tubing in the bottom half of the well and a 7” production string to the surface.

Well-head pressures have been modelled and shown to be maintained above the required minimum of 7000kPa (1050psi) at a production rate of 80MMscfd (80 Million Standard Cubic Feet per Day) across a production cycle exceeding 25 years.

Data from this modelling is now being used by APA for the Pre-FEED study.

AGR Well Design and Management

AGR have now completed the initial well planning phase of their well delivery process for the Judith-2 appraisal/exploration well. This includes well design, casing design, well costing, regulatory timeline and a drill rig market survey.

The drill rig market survey received a positive response from five drilling contractors offering both Jack-Up and Semi-Submersible Drilling Rigs. Formal tenders and direct negotiations with a preferred supplier to contract the most suitable drilling unit will commence once Emperor Energy secures an Exploration Partner via a Farm-In process currently being conducted.

The well design has been selected and is typical for wells in the area, using conventional casing sizes that are relatively easy to procure. A detailed cost analysis using AGR’s proprietarysoftware (P1) was also performed, including running Drill Stem Tests(DST). The most significant risk regarding the well cost is the rig mobilisation/demobilisation costs, driving a strategy to contract a ‘rig of opportunity’, which is already in the area.

Estimated drilling time for the Judith 2 well is 26 days with costs estimated at AUD $25 Million excluding any Drill Stem Tests (flow testing).

CGG Multi Client 3D Seismic Survey Completed

Global Seismic acquisition company CGG have recently completed a multi-client 3D Seismic Survey of the Offshore Gippsland Basin including the Judith Gas Field.

The seismic acquisition was carried out using state-of-the-art equipment and techniques including 7000m long 3D acquisition cables to ultimately generate the highest quality reservoir resolution possible.

The 3D Seismic Survey was also carried out at an orthogonal orientation to previous 3D Seismic Surveys in the area. The combination of longer cables and different orientation will offer considerable improvements in data quality for re-mapping the Judith Structure.

The first data from this survey will become available for licensing to Emperor Energy on commercial terms at the end of 2020. Final fully processed data will become available during 2021.

Management Comment

Emperor Energy Director Phil McNamara said:

'Commencing Pre-FEED kicks off a very important and valuable body of work that marks another step in Emperor Energy advancing towards the drilling of the Judith 2 well. In addition,we have been working through the well design with AGR which represents further progress. The level of interest in the Judith Gas Field from potential farm-in partners continues to be very encouraging with a number of parties assessing the data. This gives us further confidence that this is a highly sought-after opportunity in a proven hydrocarbon province. We look forward to providing shareholders with more updates as we progress.'

About the Judith Gas Field

The 100% Emperor Energy owned Judith Gas Field is located within the VIC/P47 Permit in the offshore Gippsland Basin, Victoria.

On 11th July 2019 Emperor Energy advised that an Independent Resource Statement had been completed for the Judith Gas Field within the 100% Emperor Energy owned VIC/P47 Exploration Permit located in the offshore Gippsland Basin, Victoria. The Resource Statement Highlighted:

- 2C Contingent Gas Resource of 150 Bcf
- P50 Unrisked Prospective Gas Resource of 1.226 Tcf

FEED News in Australia >>

Australia >>  10/5/2020 - Petrofac’s Engineering and Production Services (EPS) business has been awarded its first ever green hydrogen Front End Engineering Design (FEED) contr...




Australia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.