Sancak Enerji Issues Order for 24 MW in Turkey to the Nordex Group

Source: www.gulfoilandgas.com 10/1/2020, Location: Europe

End of September, the Nordex Group received a 24 MW order from its regular customer Sancak Enerji in Turkey. For the “Baglar-3” wind farm, the Nordex Group will supply five N133/4800 strong-wind turbines. The order also includes a Premium Service contract over a ten-year term.

The “Baglar-3” wind farm will be built in the Konya province, near its provincial capital of the same name, about 200 kilometres south of Ankara. Due to the very humid and cold winters at the site, the Nordex Group will supply the turbines in the Cold Climate Version (CCV). The N133/4800 will be installed on tubular steel towers with hub heights of 110 meters. With a mean annual wind speed of 8 meters per second, the strong-wind turbines are ideal for the location.

Installation will begin in summer of 2021. The Nordex Group will purchase the rotor blades, anchor cages and towers for the turbines locally in Turkey. As a result of this local production, Sancak Enerji – like all Nordex Group customers in Turkey – will benefit from a higher feed-in tariff.

“Baglar-3” is the third wind farm that the Nordex Group will equip with turbines for Sancak Enerji. In 2014, the Group supplied six N117/3000 turbines for the Urla wind farm, and in 2015, 22 N117/2400 turbines for the Yahyali wind farm.


France >>  8/9/2022 - As the installation of the wind turbines on the Saint-Nazaire offshore wind farm is underway, Louis Dreyfus Armateurs and Tidal TransitLimited are ple...
Canada >>  8/3/2022 - Capstone Green Energy Corporation (CGRN) secured a follow-on order for two C200S high-pressure natural gas microturbine systems. The customer is a Can...

United Kingdom >>  8/2/2022 - Dagang NeXchange Berhad (“DNeX”), via its subsidiary Ping Petroleum UK PLC (“Ping”), has signed a Memorandum of Understanding (“MoU”) with Cerulean Wi...
Malaysia >>  8/1/2022 - Capstone Green Energy Corporation's distributor in Malaysia and Brunei, Sekito, has secured an order for a 200 kW microturbine-based system for an oil...

United Kingdom >>  8/1/2022 - Cadeler A/S signs new agreement with Ørsted to execute the installation of turbine foundations at the Hornsea 3 offshore wind farm. This agreement eng...
Russia >>  7/29/2022 - Concrete was poured for the first wind turbine foundation at the Trunovskaya Wind Farm in the Stavropol Krai (Southern Russia).
<...





Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.